Proposed Dwelling North Of Tyneholm Shrewsbury Road Cockshutt Shropshire Data via plota.co.uk

26/03640/OUT - Outline Application Pending Consideration

Proposal

Outline application (to include access) for erection of 1no. dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Oct 2026
✓
Consultation
9 Oct 2026
Decision
Expected by 1 Dec 2026
Appeal
Appeal decided

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Nov 2026 and 8 Dec 2026, from Shropshire's recent new homes.

The consultation period closed on 30 Oct 2026.

Site constraints 4

National infrastructure project about 645 m away: Reinforcement to North Shropshire Electricity Distribution Network
The site is about 645 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Nature improvement area: Meres and Mosses; 3 listed buildings within 150 m of the postcode pin; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shropshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shropshire
Application type
Outline Application
Received
around 6 Oct 2026
Validated
6 Oct 2026
Ward
The Meres
Parish
Cockshutt-cum-Petton
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show
Agent
Halls Holdings Ltd

Decision outlook

Day 48 of the 56-day target. Shropshire usually decides new homes by day 56.

Day 488 days to the 56-day target
53%decided within 8 weeks
66%approved
255decided in the last year

Plota live figures for new homes decided by Shropshire in the last twelve months, from validation. Shropshire decision record →

Public comments

1comment received
1 supporting

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15254737
Planning Portal ref
PP-15254737
Comments by
30 Oct 2026
Site or press notice
9 Oct 2026
Statutory expiry
1 Dec 2026
Env. assessment
No
Shropshire
Planning Authority Score
7.3/10
Good
#53 of 296 overall
Relevant to this application:
Major dwellings

Shropshire is faster than most councils at deciding householder applications: #53 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shropshire decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #179 of 296
93%
Householder approved
Above avg (90%) #136 of 296
78%
Decided in 8 weeks
Above avg (63%) #53 of 296
29%
Extended time limit
Below avg (41%) #50 of 296
68%
Minor dwellings approved
350 decided (1-9 homes)
63%
Major dwellings approved
35 decided (10+ homes)
78%
Change of use approved
27 decided
2,083
Total decisions
273 refused in the year to March 2026