AD RTS Bus Stop adjacent 3 Hanover Buildings Southampton Data via plota.co.uk

26/01065/ADV - Advert Application Awaiting decision

Proposal

Installation of double sided advertising display with digital LED and internally illuminated poster Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 6 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 4 Nov 2026, from Southampton's recent signs and adverts.

Site constraints 8

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Scheduled monument 46 m away: Town wall: section from Bargate E and including Polymond Tower
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Registered park or garden 49 m away: Central Parks
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Conservation area 24 m away: Old Town North; 5 listed buildings within 150 m; Heritage at risk 24 m away: Old Town North; Inside the Southampton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 20 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advert Application
Received
11 Sept 2026
Validated
11 Sept 2026
Ward
Bargate
Case officer
Show
Target decision
6 Nov 2026
Applicant
Show

Decision outlook

Day 24 of the 56-day target. Southampton usually decides signs and adverts by day 54.

Day 2432 days to the 56-day target
76%decided within 8 weeks
95%approved
39decided in the last year

Plota live figures for signs and adverts decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
A4203
Statutory expiry
6 Nov 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Other decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026