69 St Johns Road SW11 1QX Data via plota.co.uk

2025/4674 - Application for Full Permission Pending Consideration

Proposal

Change of use from a Café (Class E) to Bar (Class Sui Generis). New shopfront and installation of green planted wall at rear. Data via plota.co.uk

View original council record ↗Last checked

Wandsworth Council is publishing its applications late: so far it has put about three fifths of those it has numbered since mid August on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
29 Dec 2025
✓
Validated
25 Feb 2026
Decision
Target date was 7 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 6 Nov 2026; it is now day 254.

The consultation period closed on 26 Mar 2026.

Licence at this address

  • Licence Twisted Sister Premises licence · in force since 22 Nov 2025 · elsewhere in the building Hours not given on the register

Licensed hours are what the licence permits, not opening times.

Site constraints 8

Clapham Junction Cons Area
Clapham Junction conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Wandsworth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Clapham Junction
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 486 m away: Thames Tideway Tunnel
The site is 486 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Clapham Junction Cons AreaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
1 listed building within 150 m; Inside the Wandsworth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wandsworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wandsworth
Application type
Application for Full Permission
Postcode
SW11 1QX
Received
29 Dec 2025
Validated
25 Feb 2026
Ward
Lavender Ward
Case officer
Show
Target decision
7 Apr 2026
Decision level
Full Committee
Applicant
Show
Agent
m83 Associates Ltd
Leaseholder
Show

Decision outlook

Day 254, past the statutory target. 79% of changes of use in Wandsworth are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 3 Nov 2026.

Day 254198 days past the 56-day target
60%decided within 8 weeks
80%approved
181decided in the last year

Plota live figures for changes of use decided by Wandsworth in the last twelve months, from validation. Wandsworth decision record →

Consultation & key dates

Alt. reference
14568342
Comments by
26 Mar 2026
Site or press notice
5 Mar 2026
Committee
2 Sept 1999
Statutory expiry
5 May 2026
Wandsworth
Planning Authority Score
4.8/10
Below average
#164 of 296 councils
Relevant to this application:
Change of use

Wandsworth ranks #172 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wandsworth decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #120 of 296
92%
Householder approved
Above avg (90%) #168 of 296
62%
Decided in 8 weeks
Below avg (63%) #172 of 296
37%
Extended time limit
Below avg (41%) #124 of 296
89%
Minor dwellings approved
680 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
36 decided
2,062
Total decisions
206 refused in the year to March 2026