Land Between Bicker Drove And Bicker Fen Substation Data via plota.co.uk

B/26/0190 - Full Planning Permission Approved

Proposal

Proposed development of an electrical connection between previously approved connection on Bicker Drove and Bicker Fen Substation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Apr 2026
✓
Validated
30 Apr 2026
✓
Consultation
22 Jun 2026
✓
Approved
21 Aug 2026

Approved on 21 Aug 2026 · Delegated Decision · Last checked 24 Sept 2026

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Beacon Fen Energy Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Triton Knoll Electrical System (decided, the site is inside its boundary); Heckington Fen Solar Park (decided, 15 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Bicker Gauntlet built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE20 3BF
Received
23 Apr 2026
Validated
30 Apr 2026
Ward
Five Village Ward
Parish
Bicker
Case officer
Show
Target decision
25 Jun 2026
Decision
Approved
Decision date
21 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Axis

How this decision compares

Decided in 113 days from validation, 112 days slower than Boston's median of 1 for utility and infrastructure works. Approved, as 96% of utility and infrastructure works here are.

81%decided within 8 weeks
96%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14548379
Neighbours
22 Jun 2026
Consultation
22 Jun 2026
Comments by
13 Jul 2026
Site or press notice
17 Jun 2026
Statutory expiry
25 Jun 2026
Env. assessment
No