St. Josephs Nursing & Residential Home 2 Princes Street, Newry, BT34 3NU Data via plota.co.uk

LA07/2025/1491/LBC - Listed Building Consent Approved

Proposal

Conversion of Day Room for use as a Bedroom with ensuites and associated fit out works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Nov 2025
✓
Validated
28 Nov 2025
✓
Consultation
29 Apr 2026
✓
Approved
3 Aug 2026

Approved on 3 Aug 2026 · Last checked 17 Oct 2026

Documents 14

All documents on the council site ↗

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
BT34 3NU
Received
27 Nov 2025
Validated
28 Nov 2025
Ward
Warrenpoint
Decision
Granted
Decision date
3 Aug 2026
Applicant
Show
Agent
McNally Morris Architects

How this decision compares

Decided in 248 days from validation, 30 days slower than Newry Mourne Down's median of 218 for listed building consent. Approved, as 100% of listed building consent here are.

0%decided within 8 weeks
100%approved
20decided in the last year

Plota live figures for listed building consent decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-14523234
Consultation
29 Apr 2026
Comments by
24 Dec 2025
Site or press notice
10 Dec 2025