Land East Of Broadacres Mill Lane Carlton North Yorkshire Data via plota.co.uk

26/04874/DISCON - Discharge of Conditions Registered

Proposal

Discharge of conditions 6 (engineering drawings), 10 (drainage), 11 (drainage), 12 (CEMP), 13 (schedule of works), 14 (contamination) and 15 (contamination) of approval Outline application (some matters reserved) for development of up to 200 residential dwellings with access to, but not within, the site (allowed on appeal ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Consultation
4 Sept 2026
Decision
Expected by 7 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 7 Oct 2026.

The consultation period closed on 28 Sept 2026.

Site constraints 2

Agricultural land, grade 3a, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
National infrastructure project 907 m away: Helios Renewable Energy Project
The site is 907 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Thorpe Marsh Gas Pipeline (decided, 1443 m); Yorkshire and Humber CCS Cross Country Pipeline (decided, 1537 m); East Coast Hydrogen Humber Pipeline (at pre-application, 868 m); Humber Carbon Capture Pipeline (at pre-application, 1042 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Discharge of Conditions
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Camblesforth & Carlton
Parish
Carlton (Selby)
Case officer
Show
Target decision
7 Oct 2026
Applicant
Show
Agent
ID Planning

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15130051
Planning Portal ref
PP-15130051
Consultation
4 Sept 2026
Comments by
28 Sept 2026
Statutory expiry
7 Oct 2026
Env. assessment
No