O/S 110 Maison Dieu Road Dover Kent Data via plota.co.uk

25/01076 - Circ 34/76 O/Head Lines/28 Day Notificat Approved

Proposal

Regulation 5 (The Electronic Communications Code (Conditions and restrictions) (Amendment) Regulations 2017) notification for the installation of a 12m pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2025
✓
Validated
30 Sept 2025
✓
Approved
15 Oct 2025

Approved on 15 Oct 2025 · Delegated · Last checked 17 Oct 2026

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Local nature reserve 360 m away: High Meadow; Coalfield, development low risk area; 1 listed building within 150 m; Inside the Dover built-up area; Conservation area 98 m away: Dour Street - Extension; Flood defence 45 m away (engineered high ground, designed for a 1 in 5 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Circ 34/76 O/Head Lines/28 Day Notificat
Received
29 Sept 2025
Validated
30 Sept 2025
Ward
Town And Castle
Parish
DOVER
Case officer
Show
Target decision
27 Oct 2025
Decision
Prior Approval Not Required
Decision date
15 Oct 2025
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 15 days from validation, 40 days faster than Dover's median of 55 for full applications. Approved, as 90% of full applications here are.

70%decided within 8 weeks
90%approved
5%go to committee

Plota live figures for full applications decided by Dover in the last twelve months, from validation. Dover decision record →

Public comments

No public comments yet.

Last counted 17 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
27 Oct 2025
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 overall
Relevant to this application:
Householder decisions

Dover is one of the fastest councils in England for householder decisions: #28 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026