Land Adjacent To Woolwich Foot Tunnel Entrance Pier Road North Woolwich London E16 2JJ Data via plota.co.uk

26/00284/AOD - Approval of Details Approved

Proposal

Approval of details pursuant to Condition 8 (Foundation Design and Settlement (Elizabeth Line Condition)) attached to Planning Consent dated 18th July 2025. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Feb 2026
✓
Approved
10 Apr 2026

Approved on 10 Apr 2026 · Approval of Details · Last checked 26 Jul 2026

Documents 85

Plans & drawings 75

PDF PRD-ASA-XX-XX-DR-A-020101-SITE LOCATION PLAN Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050801-GROUND CONNECTION DETAILS - SHEET 1 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050802-GROUND CONNECTION DETAILS - SHEET 2 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050803-GROUND CONNECTION DETAILS - SHEET 3 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050804-GROUND CONNECTION DETAILS - SHEET 4 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050805-GROUND CONNECTION DETAILS - SHEET 5 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-XX-XX-DR-A-050806-GROUND CONNECTION DETAILS - SHEET 6 Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-0L-DR-A-029999-LOWER GROUND FLOOR PLAN (1) Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-0U-DR-A-030000-UPPER GROUND AND GROUND FLOOR PLAN (1) Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-ZZ-DR-A-030601-SECTION AA Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-ZZ-DR-A-030602-SECTION BB Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-ZZ-DR-A-030603-SECTION CC Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-ZZ-DR-A-030604-SECTION DD AND FF Drawing · 6 Feb 2026 View ↗ PDF PRD-ASA-ZZ-ZZ-DR-A-030605-SECTION EE Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0G-DR-S-011099-BLOCK A - GROUND FLOOR - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0G-DR-S-011299-BLOCK A - GROUND FLOOR - BWIC AND UPSTANDS LAYOUT_ REV Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0L-DR-S-011098-BLOCK A - LOWER GF - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0L-DR-S-011298-BLOCK A - LOWER GF - BWIC AND UPSTANDS LAYOUT_ REVP03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0U-DR-S-011100-BLOCK A - UPPER GF - GA LAYOUT_ REVP03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-0U-DR-S-011300-BLOCK A - UPPER GF - BWIC AND UPSTANDS LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-FN-DR-S-011096-BLOCK A - PILE LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-FN-DR-S-011097-BLOCK A - FOUNDATION - GA LAYOUT - REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-AA-FN-DR-S-011297-BLOCK A - FOUNDATION - BWIC AND UPSTANDS LAYOUT_ REVP0 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0G-DR-S-012099-BLOCK B - GROUND FLOOR - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0G-DR-S-012299-BLOCK B - GROUND FLOOR - BWIC AND UPSTANDS LAYOUT_ REV Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0L-DR-S-012098-BLOCK B - LOWER GF - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0L-DR-S-012298-BLOCK B - LOWER GF - BWIC AND UPSTANDS LAYOUT_ REVP03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0U-DR-S-012100-BLOCK B - UPPER GF - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-0U-DR-S-012300-BLOCK B - UPPER GF - BWIC AND UPSTANDS LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-FN-DR-S-012096-BLOCK B - PILE LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-FN-DR-S-012097-BLOCK B - FOUNDATION - GA LAYOUT_ REVP04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-BB-FN-DR-S-012297-BLOCK B - FOUNDATION - BWIC AND UPSTANDS LAYOUT_ REVP0 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0G-DR-S-013099-BLOCK C - GROUND FLOOR - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0G-DR-S-013299-BLOCK C - GROUND FLOOR - BWIC AND UPSTANDS LAYOUT_ REV Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0L-DR-S-013098-BLOCK C - LOWER GF - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0L-DR-S-013298-BLOCK C - LOWER GF - BWIC AND UPSTANDS LAYOUT_ REV P03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0U-DR-S-013100-BLOCK C - UPPER GF - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-0U-DR-S-013300-BLOCK C - UPPER GF - BWIC AND UPSTANDS LAYOUT_ REV P03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-01-DR-S-013101-BLOCK C - LEVEL 01 - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-FN-DR-S-013096-BLOCK C - PILE LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-FN-DR-S-013097-BLOCK C - FOUNDATION - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-CC-FN-DR-S-013297-BLOCK C - FOUNDATION - BWIC AND UPSTANDS LAYOUT_ REV P Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0G-DR-S-014099-BLOCK D - GROUND FLOOR - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0G-DR-S-014299-BLOCK D - GROUND FLOOR - BWIC AND UPSTANDS LAYOUT_ REV Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0L-DR-S-014098-BLOCK D - LOWER GF - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0L-DR-S-014298-BLOCK D - LOWER GF - BWIC AND UPSTANDS LAYOUT_ REV P03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0U-DR-S-014100-BLOCK D - UPPER GF - GA LAYOUT_ REVP03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-0U-DR-S-014300-BLOCK D - UPPER GF - BWIC AND UPSTANDS LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-FN-DR-S-014097-BLOCK D - FOUNDATION - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-FN-DR-S-014297-BLOCK D - FOUNDATION - BWIC AND UPSTANDS LAYOUT_ REV P Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-DD-ZZ-DR-S-014161-BLOCK D - DETAIL SECTIONS - SHEET 1_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-EE-0G-DR-S-015099-BLOCK E - GROUND FLOOR - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-EE-0G-DR-S-015299-BLOCK E - GROUND FLOOR - BWIC AND UPSTANDS LAYOUT_ REV Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-EE-FN-DR-S-015097-BLOCK E - FOUNDATION - GA LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-EE-FN-DR-S-015297-BLOCK E - FOUNDATION - BWIC AND UPSTANDS LAYOUT_ REV P Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-0G-DR-S-010099-SITE WIDE - GROUND FLOOR LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-0G-DR-S-010150-SITE WIDE - LEVEL 00 SECTION KEY PLAN_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-0L-DR-S-010098-SITE WIDE - LOWER GF LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-0U-DR-S-010100-SITE WIDE - UPPER GF LAYOUT_ REVP03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-010096-SITE WIDE - PILE LAYOUT_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-010097-SITE WIDE - FOUNDATION LAYOUT_ REV P04 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-018501-FOUNDATION DETAILS_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-018631-TOWER CRANE FOUNDATION GA - TC1_ REVC01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-018632-TOWER CRANE FOUNDATION GA - TC2_ REVC01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-FN-DR-S-018633-TOWER CRANE FOUNDATION GA - TC3_ REVC01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-XX-DR-S-010011-3D VIEWS - SHEET 1_ REV P03 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-XX-DR-S-010021-BLOCK REFERENCES AND GRID COORDINATION PLAN_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-XX-DR-S-010050-SITE WIDE - TFL ASSET OVERLAY_ REVP01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-XX-DR-S-010051-SITE WIDE - TFL SECTIONS - SHEET 1_ REVP01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010033-SITE WIDE - CAPPING BEAM LAYOUT_ REVC01 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010151-SITE WIDE - BUILDING SECTIONS - SHEET 1_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010152-SITE WIDE - BUILDING SECTIONS - SHEET 2_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010153-SITE WIDE - BUILDING SECTIONS - SHEET 3_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010154-SITE WIDE - BUILDING SECTIONS - SHEET 4_ REVP02 Drawing · 6 Feb 2026 View ↗ PDF PRD-PTA-ZZ-ZZ-DR-S-010155-SITE WIDE - BUILDING SECTIONS - SHEET 5_ REVP02 Drawing · 6 Feb 2026 View ↗

All documents on the council site ↗

Associated applications 10

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 34 m away: Thames Tideway Tunnel
The site is 34 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 560 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
2 listed buildings within 150 m
Nearest: Entrance to Woolwich Pedestrian Tunnel, Grade II, 52 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Inside the Newham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Approval of Details
Postcode
E16 2JJ
Received
6 Feb 2026
Validated
6 Feb 2026
Ward
Royal Albert
Parish
Royal Docks Community Forum
Case officer
Show
Decision
Approve
Decision date
10 Apr 2026
Decision level
Approval of Details
Applicant
Show

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026