Land North Of Cambridge North Station Milton Avenue Cambridge Cambridgeshire Data via plota.co.uk

22/02771/COND3A - Condition request Awaiting decision

Proposal

Submission of details required by condition 3 (Construction Ecological Management Plan) of outline planning permission . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 27 Nov 2026.

Site constraints 2

National infrastructure project 474 m away: Cambridge Waste Water Treatment Plant Relocation
The site is 474 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: A14 Cambridge to Huntingdon Improvement Scheme (decided, 1093 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 30 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Local nature reserve 217 m away: Bramblefields
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Condition request
Received
2 Oct 2026
Validated
2 Oct 2026
Ward
Milton (Detached)
Parish
Milton CP (DET)
Case officer
Show
Target decision
27 Nov 2026
Applicant
Show
Agent
Bidwells LLP

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
27 Nov 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026