70 affordable homes at Land at Maes y Felin (between Top Llan Road and A470) Glan, Conwy

Summary of planning committee decision

Decided by Conwy Planning Committee on 14 Oct 2026.

0/53439Approved

What was proposed

The application proposed 70 affordable homes with access, open space, landscaping and highway and pedestrian improvements.

“Residential development of 70 dwellings, access, open space and all associated works (amended proposals on part of the site to those approved under reference 0/46977)”

Officer report

The site and surroundings

The 3.07-hectare site is agricultural land allocated for housing and open space, beside existing housing, a dwelling, farmland and a watercourse.

“The application site relates to 3.07 hectare of agricultural land on the eastern side of Llanrwst Road (A470) within the Glan Conwy Tier 1 Main Village settlement boundary. The land is allocated in the LDP for mixed use housing (80 dwellinghouses) and public open space. The land immediately to the north and west of the application site is currently being developed (phase 1) and was granted consent in planning permission 0/49777.”

“The land slopes downward from the site boundary with Top Llan Road (approximately 30m – 40m AOD) towards the site boundary with Llanrwst Road/A470 carriageway (approximately 16m – 27m AOD). The site adjoins existing established housing development to the north, a dwellinghouse Cae Glas, agricultural land to the east and a watercourse, Nant Garreg Ddu, to the west.”

Officer report

What officers recommended

Officers recommended conditional permission subject to a Section 106 agreement, with refusal if the agreement was not completed within three months.

“A) Minded to grant conditional planning permission, subject to the applicant entering into a Section 106 agreement in respect of commuted sum payments; the delivery and management of affordable housing; and the delivery and management of on- site open space.”

“B) In the event that the matter referred to in A) above is not completed within three months from the date of the Committee determination (or such longer period as may be agreed by the Development and Building Control Manager) to refuse planning permission.”

Officer report

Design and infrastructure

The scheme included varied homes, 9,149.53 square metres of open space, pedestrian links, highway works and drainage measures.

“The application seeks full planning permission for the erection of 70 dwellinghouses as 100% grant funded affordable dwellinghouses, together with public open space, landscaping, means of highway and pedestrian accesses, local highway and pedestrian infrastructure improvements.”

“Access – Vehicular/pedestrian site accesses have been created onto Llanrwst Road (A470) as part of the phase 1 planning consent and the current infrastructure (spine road) leads to the application site to allow for continuation to the application site (phase 2). A pedestrian link footway connecting Llanrwst Road and Top Llan Road will be provided through the existing phase 1 land and within the application site.”

Officer report

Who spoke

A speaker spoke against the application and the agent spoke in favour.

What members said

Members supported the application and welcomed its quality, housing provision and landscaping.

“An addendum to the report was presented, highlighting the following: • A correction to the table in paragraph 61 was highlighted. • The Conwy County Borough Council Tree Officer was satisfied that sufficient soil depth existed to mitigate the minor incursion into the Root Protection Area, subject to the approved mitigation measures being implemented.”

“Members were supportive of the application, welcoming the quality of the development, housing provision and landscaping.”

Minutes

The committee decision

The committee was minded to grant conditional permission, subject to the Section 106 agreement, and authorised delegated determination.

“(a) That the Planning Committee be minded to grant conditional planning permission, subject to the applicant entering into a Section 106 agreement in respect of commuted sum payments; the delivery and management of affordable housing; and the delivery and management of on-site open space.”

“(b) That, in the event that the matter referred to in (a) above is not completed within three months from the date of the Committee determination (or such longer period as may be agreed by the Development and Building Control Manager) planning permission be refused.”

Minutes

Councillors at the meeting

The minutes record this decision with no vote against, so each member present for this item is shown as voting for it.

Apologies Goronwy O. Edwards Independent, Andrew David Wood Independent

Also attending Sharon Doleman Independent, Stephen Anthony Price Labour, Susan Shotter Welsh Liberal Democ

Source: Plota analysis of the council's minutes; parties from the council's list of councillors.

Sources

  • Conwy Planning Committee minutes, 14 October 2026
  • Agenda and papers (council website)

Source: Plota analysis of Conwy's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Conwy
Date
Wednesday 14 October 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Councillors
12Independent 4Conservative 2Plaid Cymru a’r Blaid… 2Citizens First A 1Labour 1Reform UK Wales 1Welsh Liberal Democ 1Show votes
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

30 decisions in the 12 months to this meeting, 1 against officer advice.

Source: Plota analysis of the committee's minutes.