Good Neighbours House 38 Mary Datchelor Close London Southwark SE5 7AX Data via plota.co.uk

25/AP/2204 - Approval of Details Approved

Proposal

Partial discharge of condition 14 'Vertical sound transmission between commercial and residential premises' pursuant to planning permission granted on 01.11.2023 for: (Variation of Condition 14 (Acoustic Levels) of planning permission : 'Refurbishment and change of use of existing hostels to create 13 Self-contained flats for social rent, including associated landscaping works, cycle parking and bin storage' to require party walls, floors and ceilings between the commercial premises and residential dwellings to be designed to achieve a minimum weighted standardized level difference of: 50 dB DnT,w + Ctr between TMO Offices and residential units above 55 dB DnT,w + Ctr between TMO Community Hall and adjacent residential units.)' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Aug 2025
✓
Validated
7 Aug 2025
✓
Approved
4 Sept 2025

Approved on 4 Sept 2025 · Source Team · Last checked 16 Oct 2026

Associated applications 6

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m; National infrastructure project 1.8 km away: Thames Tideway Tunnel; Inside the Southwark built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 94 m away: Camberwell.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Postcode
SE5 7AX
Received
1 Aug 2025
Validated
7 Aug 2025
Ward
St Giles
Case officer
Show
Target decision
1 Oct 2025
Decision
AOD - Granted
Decision date
4 Sept 2025
Decision level
Source Team
Applicant
Show
Agent
Baily Garner LLP

How this decision compares

Decided in 28 days from validation, 23 days faster than Southwark's median of 51 for discharge of conditions. Approved, as 97% of discharge of conditions here are.

57%decided within 8 weeks
97%approved
851decided in the last year

Plota live figures for discharge of conditions decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Oct 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Change of use

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026