Cumbernauld Electricity Substation Forest Road Abronhill Cumbernauld North Lanarkshire Data via plota.co.uk

26/00718/FUL - Planning Permission Pending Consideration

Proposal

Extension and alteration of electrical substation, erection and alteration of associated plant and works associated with this, importation and exportation of material, demolition and replacement of single storey control building, additional vehicular access/egress, earth works, drainage, landscaping, security fence, parking, lighting and associated works (National EIA Development as also part of Denny to Wishaw Network Upgrade) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Jun 2026
✓
Validated
28 Aug 2026
Decision
Expected by 23 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 21 Oct 2026 and 12 Nov 2026, from North Lanarkshire's recent demolitions. The consultation period closed on 2 Oct 2026.

Documents 295

Statements & assessments 253

PDF Vol2 ch 8 fig 8.17 2024-25 bean goose flight and foraging roosting activity Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 2 fig 12.1 xx routetier3assessment rev 02 Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 12 fig 12.6 cumbernauld noise contours Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 12 fig 12.5 cumbernauld nsr locations Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 12 fig 12.4 bonnybridge noise contours Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 12 fig 12.3 bonnybridge_nsr_locations. Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 12 fig 12.2 xr routetier3assessment rev02 Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 14 fig 14.1 forestry study area Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 14 fig 14.2 forestry survey units Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 14 fig 14.3 forestry felling areas Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Vol 2 ch 16 fig 16.2 inter-project cumulative assessment Environmental Impact Assessment · 28 Aug 2026 View ↗ PDF Proposed drainage layout Drawing · 25 Aug 2026 View ↗ PDF Vol 1 chapter 4 addendum Environmental Impact Assessment · 31 Jul 2026 View ↗ PDF Design and access statement addendum as - revision Report · 31 Jul 2026 View ↗ PDF Vol 3 app 10-1 ph 1 geoenviro and geotech report addendum Environmental Impact Assessment · 31 Jul 2026 View ↗ PDF Planning statement addendum Report · 31 Jul 2026 View ↗ PDF Cumbernauld substation extension _ design and access statement Report · 23 Jul 2026 View ↗ PDF Vol 1 ch 14 forestry Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 11 traffic and movement Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 12 noise and vibration Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 13 socioeconomics and recreation Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 15 other environmental matters Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 18 summary and conclusions Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 3 evolution of design and alternatives Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 4 project description Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 5 planning policy Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 6 landscape and visual impact assessment Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 7 cultural heritage Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 9 water environment Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 10 fig 10-4 mining features Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 13 fig 13-1 baseline study area Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 13 fig 13-2 drive-time area Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 16 fig 16-2 inter-project cumulative assessment Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 7 fig 7-2 non designated heritage assets part 3 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 7 fig 7-3 designated and non designated heritage asset Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-13 all bean goose results Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-14 -2019-20 bean goose foraging roosting activi Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-15 - 2019-20 bean goose flight activity Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-16 - 2021-22 bean goose flight, foraging roostng Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-17 - 2024-25 bean goose flight and foraging roos Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-18 - non-breeding season goose flights _excludin Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-18 - non-breeding season goose flights _excludin Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-19 - non-breeding season non-goose flights Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-20 - 2021-22 non-breeding season goose flights _ Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-21 - 2021-22 non-breeding season non-goose fligh Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-22 - 2024-25 non-breeding season goose flights _ Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-23 - 2024-25 non-breeding season non-goose flights Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-24 - 2019-20_ 2021-22 and 2024-25 non-breeding s Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-25 - 2022 breeding season goose flights Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-26 - 2022 breeding season non-goose flights Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-27 - territory analysis results_optimized Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-30 - bean goose counts 2020-2025 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-31 - bean goose 2020-2021 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-32 - bean goose 2021-2022 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-33 - bean goose 2022-2023 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-34 - bean goose 2023-2024 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-35 - bean goose 2024-2025 Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 8 fig 8-36 - location of bird flight divertors on the new build line Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 9 fig 9-5 surface water flood risk Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 9 fig 9-6 pluvial flood risk Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 9 fig 9-7 potential gwdtes with superficial geology_op Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 ch 9 fig 9-8 potential gwdtes with bedrock geology Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 1 ch 1 introduction Environmental Impact Assessment · 23 Jul 2026 View ↗ PDF Vol 2 chap 10 fig 10.5 potential sources of contamination 6 of 10 vol 2 chap 10 Environmental Impact Assessment · 25 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.3 proposed site layout overview Environmental Impact Assessment · 23 Jun 2026 View ↗ PDF Vol 3 ch 12 app12.1 nia acoustic glossary Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.2 ohl nia baseline part 1 Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.2 ohl nia baseline part 2 Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.3 ohl construction nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.4 ohl operational nia part 1 nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.4 ohl operational nia part 2 Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.6 bbss operational nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.8 css operational nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.5 bbss construction nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 12.7 css construction nia Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.2 projects works plan Environmental Impact Assessment · 16 Jun 2026 View ↗ PDF Vol 3 app 9.1 surface water feature register Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 1.1 statement of competence Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 14.1 forestry survey schedule Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 14.2 ext management felling plates Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 15.1 electric and magnetic field report Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 2.1 gate check report_part 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 4.1 project tower schedule Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 6.1 landscape and visual methodology Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 6.2 additional landscape baseline Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 6.3 landscape assessment Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 6.4 visual assessment Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 7.1 gazetteer Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.1 overhead lines habitat results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.10 uprated lines otter and water vole Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.11 uprated lines great crested newt Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.15 md-sedd checklist Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.2 wb_ cb_ aa_ bat results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.3 wb_ cb_ aa otter and water vole results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.4 wb_ cb_aa great crested newt results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.7 bean goose action group data Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.9 uprated lines bat results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.2 watercourse crossings Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.3 wfd bodies Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.5 easr authorisations Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.6 gwdte Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1a east towards rough castle roman fort existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1a east towards rough castle roman fort proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1a east towards rough castle roman fort wireframe Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1b northeast towards wester carmuirs roman existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1b northeast towards wester carmuirs roman proposed yea Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 1b northeast towards wester carmuirs roman wireframe Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 2 northeast towards camelon roman forts existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 2 northeast towards camelon roman forts proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 2 northeast towards camelon roman forts wireframee Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 3 from near the south gate of wester camuir existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 3 from the south gate of wester camuirs proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 heritage viewpoint 3 from the south gate of wester camuirs wireframe Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Name hidden Show Environmental Impact Assessment · 12 Jun 2026 View ↗
PDF Vol 4 landscape vp 1 a803 falkirk road _existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 1 a803 falkirk road _proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 1 a803 falkirk road _proposed year 15 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 2 bridge over forth and clyde canal _existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 2 bridge over forth and clyde canal _proposed y Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Dwno app b bng post dev habitats sheets 30-40 Report · 12 Jun 2026 View ↗ PDF Dwno app b bng post dev habitats sheets 41-52 Report · 12 Jun 2026 View ↗ PDF Dwno app c scottish biodiversity overhead line falkirk Report · 12 Jun 2026 View ↗ PDF Dwno app c scottish biodiversity toolkit_overhead line north lanarkshire Report · 12 Jun 2026 View ↗ PDF Vol 2 ch 1 fig 1.1 overview of denny to wishaw network upgrade Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 1 fig 1.2 project location plan Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 3 fig 3.1 key modified preferred route options Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 3 fig 3.2 route options & 2021 preferred route option Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 3 fig 3.3 modified preferred route option Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.3 cumbernauld site layout Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.4 cumbernauld substation temp works layout Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.1 project components location plan Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.5 distribution line diversion works plan Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.1 topography Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.2 zone of theoretical visibility Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.3 new towers zone of theoretical visibility Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch6 fig 6.4 landscape designations & ztv's Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.5 landscape character types & ztv's Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.6 eia local landscape character area/units & ztv's Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 chap 6 fig 6.7 representation viewpoints & ztv's Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.8 cumulative schemes & zone of theoretical visibility Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.9 outline landscape mitigation plan Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 6 fig 6.10 outline landscape mitigation plan - cumbernauld Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.2 non-designated heritage assets sheet 1-15 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.2 non-designated heritage assets - (sheet 16 - 27) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.4 designated heritage assets - (sheet 1 - 5) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.5 designated & non designated heritage assets - (sheet 1 - 2) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.6 designated & non designated heritage assets - (sheet 1 - 6) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.7 designated & non designated heritage assets - (sheet 1 - 7) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.8 designated & non designated heritage assets - (sheet 1 - 4) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 chap 7 fig 7.9 designated & non designated heritage assets within 250m stu Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.10 designated & non designated heritage assets within 250m stud Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.11 designated & non designated heritage assets within 250m stud Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2- chap 7 fig 7.12 desig & non desig heritage assets 250m study area Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.13 designated & non designated heritage assets within 250m stud Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.14 designated & non designated heritage assets within 250m stud Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.15 designated & non designated heritage assets within 250m stud Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.16 heritage viewpoints Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2- ch 8 fig 8.1a international & national desig sites Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.2 ancient woodland (sheet 1 - 31) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.6 bat roost suitability (sheet 1 - 27) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 chap 8 fig 8.7 otter & water vole survey results (sheet 1 -7) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.8a great crested newt habitat suitability (sheet 1 -22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 chap 8 fig 8.11 vantage point survey locations Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 16 fig 16.1 inter-project cumulative assessment Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.5 distribution line diversion works plan Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 4 fig 4.5 distribution line diversion works plan (sheet 11 - 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 7 fig 7.1 designated heritage assets (sheet 1 -10) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.1b local designated sites (sheet 1 - 4) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.3 phase 1 habitat survey result (sheet 1 - 43) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.3 phase 1 habitat survey result (sheet 26 - 43) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.4 priority & notable habitats & invasive non native species Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.4 priority & notable habitats & invasive non native species (sh Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.5 potential groundwater dependent terrestrial ecosystems (sheet Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.5 potential groundwater dependent terrestrial ecosystems (sheet Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.8b great crested newt population assessment results Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 8 fig 8.12 general breeding bird survey transects Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 9 fig 9.1 surface water receptors (sheet 1 - 11) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 9 fig 9.2 groundwater receptors (sheet 1 - 11) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 9 fig 9.3 groundwater wfd bodies (sheet 1 - 11) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 9 fig 9.4 water course crossings (sheet 1 - 11) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 9 fig 9.8 potential gwdtes with bedrock geology (sheet 1 - 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 10 - fig 10.1 geology - superficial deposits (sheet 1 - 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 - ch 10 fig 10.2 geology bedrock (sheet 1 - 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 10 fig 10.3 geology peats (sheet 1 - 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 10 fig 10.5 potential sources of contamination (sheet 1 - 10) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 11 fig 11.1 study area roads (sheet 1 - 8) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 11 fig 11.2 traffic surveys & dft count locations (sheet 1 - 8) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 11 fig 11.3 injury accident locations 2020-2024 (sheet 1 - 8) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 - ch 13 fig 13.3 local infrastructure (sheet 1- 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 2 ch 13 fig 13.4 core paths (sheet 1- 22) Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 7.2 - site photos Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 7.3 archaeological potential Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 7.4 world heritage site Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.4 flood risk assessment 1 of 4 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.4 denny north substation flood risk assessment 2 of 4 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.4 wishaw substationflood risk assessment 3 of 4 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 9.4 flood risk assessment cumbernauld ss Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 16.1 long list Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 16.3 stage 1 & 2 summary Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 - app 16.4 - shortlisted dev info Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 3 falkirk wheel existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 3 falkirk wheel proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 4 rough castle roman fort existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 4 rough castle roman fort proposed 1 year Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 5a core path off beam rd existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 1-9 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 10-17 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheet 18-25 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 26-33 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 34-43 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 44-52 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 53-63 Report · 12 Jun 2026 View ↗ PDF Dwno app a bng baseline habitats sheets 64-70 Report · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 5a core path off beam rd proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 5b core path off beam rd proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 5b core path off beam rd existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 6 core path along arns rd existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Dwno app b bng post dev habitats sheet 1-9 Report · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 6 core path along arns rd proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Dwno app b bng post dev habitats sheet 10-20 Report · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 7 cnauld house park existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Dwno app b bng post dev habitats sheet 21-29 Report · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 7 cnauld house park proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 - landscape vp 8 forest road existing vol 4 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 8 forest rd propsoed wireline landscape Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 9 core path east of cnauld existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 9 core path east of cnauld proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 9 core path Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 10 - palacerigg golf existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 10 palacerigg golf proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 11 greengairs existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 11 greengairs proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 12 brackenhirst rd existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 12 brackenhirst rd proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 13 alnwick cres glenmavis existing Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 landscape vp 13 alnwick cres glenmavis proposed year 1 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 4 visualisations Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Planning statement Report · 12 Jun 2026 View ↗ PDF Non technical summary Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 11.1 traffic & transport 2025 Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 16.2 intra-project screening asse Environmental Impact Assessment · 12 Jun 2026 View ↗ PDF Vol 3 app 8.8 statement to inform hra Environmental Impact Assessment · 12 Jun 2026 View ↗

Plans & drawings 22

PDF Cumbernauld substation outline landscape plan Drawing · 28 Aug 2026 View ↗ PDF Proposed external works layout Drawing · 25 Aug 2026 View ↗ PDF Proposed site plan Drawing · 25 Aug 2026 View ↗ PDF Proposed substation layout Drawing · 25 Aug 2026 View ↗ PDF Proposed and existing substation elevation a Drawing · 25 Aug 2026 View ↗ PDF Proposed and existing substation elevation b Drawing · 25 Aug 2026 View ↗ PDF Proposed and existing substation elevation c Drawing · 25 Aug 2026 View ↗ PDF Proposed and existing substation elevation d Drawing · 25 Aug 2026 View ↗ PDF Existing site plan Drawing · 24 Aug 2026 View ↗ PDF Updated location plan Drawing · 23 Jul 2026 View ↗ PDF Dwno-morg-cs-cumbsubs-tm-cc-0001 traffic management plan Report · 23 Jul 2026 View ↗ PDF Initial peat management plan wb route part 1 of 2 Report · 12 Jun 2026 View ↗ PDF Initial peat management plan wb route part 2 of 2. Report · 12 Jun 2026 View ↗ PDF Earthworks plan Drawing · 12 Jun 2026 View ↗ PDF Existing plant elevations Drawing · 12 Jun 2026 View ↗ PDF Existing switchgear room elevation plan Drawing · 12 Jun 2026 View ↗ PDF External lighting plot layout Drawing · 12 Jun 2026 View ↗ PDF External lighting plot Drawing · 12 Jun 2026 View ↗ PDF Proposed access visibility splays Drawing · 12 Jun 2026 View ↗ PDF Control building plan Drawing · 12 Jun 2026 View ↗ PDF Proposed control building elevation plan Drawing · 12 Jun 2026 View ↗ PDF Cumbernauld substation traffic management plan Report · 12 Jun 2026 View ↗

All documents on the council site ↗

Work with planning data?

Every application in North Lanarkshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Received
12 Jun 2026
Validated
28 Aug 2026
Ward
Cumbernauld East
Case officer
Show
Decision level
Full Council
Applicant
Show
Agent
SP Energy Networks

Decision outlook

Day 37 of the 56-day target. North Lanarkshire usually decides demolitions by day 57.

Day 3720 days to the predicted decision (day 57)
48%decided within 8 weeks
92%approved
29decided in the last year

Plota live figures for demolitions decided by North Lanarkshire in the last twelve months, from validation. North Lanarkshire decision record →

Public comments

No public comments yet.

Last counted 26 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100751890-001
Comments by
2 Oct 2026
Env. assessment
No