OS St Mary's Church Church Road Tilston SY14 7HB Data via plota.co.uk

26/01640/DSM - DSLAM/Antenna Notification Approved

Proposal

Installation of fixed line broadband apparatus. Ref: OGEAA4475056 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 May 2026
✓
Approved
14 May 2026

Approved on 14 May 2026 · Last checked 9 Sept 2026

Site constraints 6

1 listed building within 150 m of the postcode pin
Nearest: Garage/Workshop to North of No 21, Grade II, about 20 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Public footpath about 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Inside the Tilston built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
DSLAM/Antenna Notification
Postcode
SY14 7HB
Received
13 May 2026
Validated
13 May 2026
Ward
Farndon
Parish
Tilston
Decision
Notification Closed
Decision date
14 May 2026
Applicant
Show

How this decision compares

Decided in 1 days from validation, about the council's usual 1 days. Approved, as 99% of utility and infrastructure works here are.

90%decided within 8 weeks
99%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No