O/S Of 8 Holme Gardens Stainforth Doncaster Data via plota.co.uk

26/02142/PDTEL - PD Telecommunications Decided

Proposal

Notification to utilise permitted development rights in accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) - install fixed line broadband electronic communications apparatus - OGEAA8013338 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2026
Decision
Expected by 8 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Dec 2026 and 4 Jan 2027, from Doncaster's recent utility and infrastructure works.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 624 m away: Yorkshire and Humber CCS Cross Country Pipeline
The site is 624 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m; Coalfield, development low risk area; Inside the Stainforth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 13 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
PD Telecommunications
Received
10 Nov 2026
Validated
10 Nov 2026
Ward
Stainforth And Barnby Dun
Parish
Stainforth Town Council
Case officer
Show
Target decision
8 Dec 2026
Applicant
Show
Agent
Sunmathi Sri - Openreach

Decision outlook

Day 13 of the 56-day target. Doncaster usually decides utility and infrastructure works by day 48.

Day 1343 days to the 56-day target
65%decided within 8 weeks
91%approved
59decided in the last year

Plota live figures for utility and infrastructure works decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
8 Dec 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 overall
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions: #27 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026