46 Newcomen Terrace Redcar Data via plota.co.uk

R/2026/0462/RT - Retrospective Valid

Proposal

Change of Use of two self contained flats to 8 Bed HMO (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jun 2026
✓
Validated
2 Jul 2026
Decision
Target date was 27 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 24 Nov 2026; it is now day 145.

The consultation period closed on 29 Jul 2026.

Documents 20

All documents on the council site ↗

Site constraints 10

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Filey Brigg to Newport Bridge about 8 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Special protection area about 37 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 37 m away: Teesmouth and Cleveland Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1.2 km away: The Net Zero Teesside Project; Nature recovery project: Tees Estuary Recovering Nature (TERN); Flood defence about 33 m from the postcode pin (wall, designed for a 1 in 300 year flood); Inside the Redcar built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Retrospective
Postcode
TS10 1DD
Received
29 Jun 2026
Validated
2 Jul 2026
Case officer
Show
Decision level
S2 TBC
Applicant
Show
Agent
LJC Architectural Design

Decision outlook

Day 145, past the statutory target. 89% of changes of use in Redcar and Cleveland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 14589 days past the 56-day target
57%decided within 8 weeks
94%approved
8%go to committee

Plota live figures for changes of use decided by Redcar and Cleveland in the last twelve months, from validation. Redcar and Cleveland decision record →

Public comments

4comments received

13 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
7 Jul 2026
Comments by
29 Jul 2026
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 overall
Relevant to this application:
Change of use

Redcar and Cleveland is #169 of 296 councils on householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026