Land North of Newbiggin Road Kirkby Thore Penrith CA10 1UT Data via plota.co.uk

2026/1821/FPA - Full Application Consultation Started

Proposal

Erection of two dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 27 Nov 2026, from Westmorland and Furness's recent new homes.

Comments are open until 23 Oct 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 37 m away: A66 Northern Trans-Pennine Project
The site is about 37 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument about 93 m away: Kirkby Thore Roman Fort and Associated Vicus
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: East of Eden; Inside the Kirkby Thore built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
CA10 1UT
Received
15 Sept 2026
Validated
15 Sept 2026
Ward
Eden and Lyvennet Vale
Parish
Kirkby Thore
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Addis Town Planning Ltd

Decision outlook

Day 24 of the 56-day target. Westmorland and Furness usually decides new homes by day 66.

Day 2442 days to the predicted decision (day 66)
45%decided within 8 weeks
78%approved
60decided in the last year

Plota live figures for new homes decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
28 Sept 2026
Comments by
23 Oct 2026
Site or press notice
2 Oct 2026
Statutory expiry
10 Nov 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026