LAND ADJ VANGUARD BUSINESS PARK , ALLINGTON LANE, eastleigh, SO30 3HP Data via plota.co.uk

F/26/102449 - Industry, Storage, Warehousing Valid

Proposal

Retrospective consent for laying of a hardstanding, creation of a bund and the change of use of land for open storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
✓
Validated
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 8 Jan 2027, from Eastleigh's recent changes of use.

Comments are open until 8 Dec 2026

Comment on this application ↗

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 22 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
Industry, Storage, Warehousing
Postcode
SO30 3HP
Received
11 Nov 2026
Validated
16 Nov 2026
Ward
West End North Ward
Parish
West End CP
Target decision
11 Jan 2027
Decision level
Delegated Decision
Applicant
Show
Agent
ACA Design Limited (Amrik Chahal)

Decision outlook

Day 7 of the 56-day target. Eastleigh usually decides changes of use by day 53.

Day 749 days to the 56-day target
69%decided within 8 weeks
89%approved
36decided in the last year

Plota live figures for changes of use decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Consultation & key dates

Comments by
8 Dec 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 overall
Relevant to this application:
Change of use

Eastleigh is faster than most councils at deciding householder applications: #94 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026