PA/26/01207/S - Non-material amendment (TCPA S96a) Refused

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 03/11/2025. Non Material amendment(s) Sought: The introduction of a single conservation-style rooflight within the approved mansard roof slope. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Jul 2026
✗
Refused
10 Aug 2026
Appeal
Not lodged

Refused on 10 Aug 2026 · Delegated · Last checked 17 Aug 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive
    • AmendmentApplication for Non-Material amendment, Dated. Non Material amendment(s) Sought…RefusedThis applicationPA/26/01207/S

Site constraints 8

Medway conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Archaeological priority area: Tower Hamlets APA 2.22
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 940 m away: Thames Tideway Tunnel
The site is 940 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
2 listed buildings within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E3 5BT
Received
14 Jul 2026
Validated
14 Jul 2026
Ward
Bow West
Case officer
Show
Target decision
11 Aug 2026
Decision
Refuse
Decision date
10 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
ARCHITEKTAS LTD

Consultation & key dates

Statutory expiry
11 Aug 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use