4 Station Terrace Penclawdd Swansea SA4 3XX Data via plota.co.uk

2026/1323/PRE - Pre App Welsh Government Being Considered

Proposal

(Pre-application) Chimney re-crown and repointing, lead flashing and soakers. Roof replacement of main building and single story extension using new fibre cement slates. Roof replacement of main building and single story extension using new fibre cement slates. Replacement of lead work joining the single story extension to the main building using new code (4) lead work and soakers. Re-rendering to the rear of the property. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2026
✓
Validated
24 Aug 2026
✓
Consultation
25 Aug 2026
Decision
Target date was 14 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 91.

The consultation period closed on 25 Aug 2026.

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Penclawdd conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Special area of conservation 116 m away: Carmarthen Bay and Estuaries / Bae Caerfyrddin ac Aberoedd
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
SSSI 116 m away: Burry Inlet and Loughor Estuary
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £180,000 in November 2025. Terraced house, freehold.

25 November 2025£180,000
7 October 2015£121,000
5 June 2009£102,500

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Swansea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swansea
Application type
Pre App Welsh Government
Postcode
SA4 3XX
Received
11 Aug 2026
Validated
24 Aug 2026
Ward
Penclawdd - Area 2
Target decision
14 Sept 2026
Applicant
Show

Decision outlook

Day 91, past the statutory target. 93% of extensions in Swansea are decided within thirteen weeks, which runs to 23 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 9135 days past the 56-day target
74%decided within 8 weeks
82%approved
515decided in the last year

Plota live figures for extensions decided by Swansea in the last twelve months, from validation. Swansea decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
25 Aug 2026
Comments by
25 Aug 2026
Statutory expiry
14 Sept 2026
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use