Land South of Bray Lake Windsor Road Maidenhead Data via plota.co.uk

26/02805/CONDIT - Discharge of Condition Awaiting decision

Proposal

Details required by Condition 3 (Materials) and Condition 5 (External Lighting) of planning permission 25/03312/VAR for a variation (under Section 73) of Condition 29 (Approved Plans) to substitute those plans approved under for an outline application for access, appearance, layout and scale only to be considered at this stage with all other matters to be reserved for the construction of x99 dwellings with associated vehicular and pedestrian access, car parking, drainage works and open space with amended plans. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
Decision
Expected by 10 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 10 Jan 2027.

Site constraints 7

National infrastructure project 242 m away: M4 Junctions 3 to 12 Smart Motorway
The site is 242 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Local nature reserve 240 m away: Braywick Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
1 listed building within 150 m; Radon affected area, class 2; Inside the Maidenhead built-up area; Green belt 48 m away: London.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Condition
Received
16 Nov 2026
Validated
16 Nov 2026
Ward
Bray
Parish
Bray Parish
Target decision
10 Jan 2027
Applicant
Show

Consultation & key dates

Alt. reference
PP-15373201
Planning Portal ref
PP-15373201
Statutory expiry
10 Jan 2027
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 overall
Relevant to this application:
Householder decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications: #82 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026