Land North And South Of Stoke Lane Swainsthorpe Norfolk Data via plota.co.uk

2026/2392 - EIA Scoping Opinion Pending Consideration

Proposal

Request for EIA Scoping Opinion in accordance with Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in relation to proposed solar photovoltaic installation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2026
✓
Consultation
14 Aug 2026
Decision
Expected by 15 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 59.

The consultation period closed on 28 Aug 2026.

Site constraints 7

Grade II listed: Dairy Farmhouse
List entry 1373205 · 22 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Local nature reserve 43 m away: Dunston Common
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 401 m away: Hornsea Project Three Offshore Wind Farm
The site is 401 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sheringham and Dudgeon Extension Projects (decided, 401 m); Norwich to Tilbury (examination closed, recommendation due, 401 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 3 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA Scoping Opinion
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
Newton Flotman
Parish
Swainsthorpe
Case officer
Show
Target decision
15 Sept 2026
Applicant
Show

Decision outlook

Day 59, past the statutory target. 99% of eia screening and scoping opinions in South Norfolk Broadland are decided within thirteen weeks, which runs to 10 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 593 days past the 56-day target
93%decided within 8 weeks
96%approved
1,357decided in the last year

Plota live figures for eia screening and scoping opinions decided across the UK in the last twelve months, from validation; too few recent eia screening and scoping opinions in South Norfolk Broadland to go on. South Norfolk Broadland decision record →

Public comments

3comments received
2 objecting1 neutral

67% object · below the UK average of 74%

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
14 Aug 2026
Comments by
28 Aug 2026
Statutory expiry
15 Sept 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026