3 Maple Drive Bristol BS9 1FN Data via plota.co.uk
Proposal
Erection of a first-floor side extension above the existing garage and replacement of windows on the rear elevation. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 21 Nov 2026 and 30 Nov 2026, from Bristol's recent extensions.
Documents 11
Plans & drawings 9
Application forms 1
Consultation & comments 1
Site constraints 3
Checked on 15 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Sales history 1
Last sold for £740,000 in May 2015. Detached house, freehold.
Sale prices from HM Land Registry's price paid record, matched to this application by its address.
Building
From the energy performance certificate lodged in April 2015, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate
Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
31 Old Sneed Road Bristol BS9 1ES
T1 - Common dogwood - Fell.
33 Old Sneed Park Bristol BS9 1RG
T1 - Conifer - Fell. T2 - Holm Oak - Fell.
The Old Signal Station Sea Mills Lane Bristol BS9 1DX
Demolition of rear extension and extension to ground and first floor.
25 Old Sneed Park Bristol BS9 1RG
T1 - Eucalyptus gunnii - Crown reduce by 3m from top and sides to leave height o...
Stoke Lodge Shirehampton Road Sea Mills Bristol BS9 1BN
5 Day Notice: T5 (plot 200162) - Turkey oak - Remove failed limbs and prune back...
18 Druid Road Bristol BS9 1LH
Demolition of existing single storey extension and erection of new single storey...
Important details
Decision outlook
Day 15 of the 56-day target. Bristol usually decides extensions by day 49.
Plota live figures for extensions decided by Bristol in the last twelve months, from validation. Bristol decision record →
Public comments
No public comments yet.
6 neighbours consulted · Last counted 21 Oct 2026
Consultation & key dates
- Alt. reference
- PP-15279994
- Planning Portal ref
- PP-15279994
- Comments by
- 5 Nov 2026
- Statutory expiry
- 3 Dec 2026
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
3 Maple Drive Bristol BS9 1FN
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

Comments are open until 5 Nov 2026