Elsecar Heritage Centre, Wath Road, Elsecar, Barnsley, S74 8HJ Data via plota.co.uk

2026/0985 - Full (Regulation 3) Registered Comment Until 11 December 2026 Add Comment

Proposal

Installation of new fibre broadband infrastructure and new external CCTV systems across the site. (Full Consent) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 11 Jan 2027, from Barnsley's recent utility and infrastructure works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Site constraints 12

12 listed buildings within 150 m of the postcode pin
Nearest: Building 17, former fitting shop at Elsecar Central Workshops, Grade II*, about 3 m from the postcode pin · 10 Grade II*, 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 19 m from the postcode pin (reference 438399-031).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Elsecar conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Scheduled monument about 41 m away: The former Elsecar Ironworks
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve about 380 m away: Elsecar Reservoir; Radon affected area, class 2; Nature improvement area: Dearne Valley Green Heart; Heritage at risk about 41 m away: The Former Elsecar Ironworks; Inside the Hoyland built-up area; Green belt about 90 m away: South and West Yorkshire.
Not affected
Outside flood zones 2 and 3

Checked on 20 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barnsley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Barnsley
Application type
Full (Regulation 3)
Postcode
S74 8HJ
Received
16 Nov 2026
Validated
16 Nov 2026
Ward
Hoyland Milton Ward
Case officer
Show
Target decision
11 Jan 2027
Decision level
Under Consideration
Applicant
Show

Decision outlook

Day 7 of the 56-day target. Barnsley usually decides utility and infrastructure works by day 56.

Day 749 days to the 56-day target
68%decided within 8 weeks
96%approved
25decided in the last year

Plota live figures for utility and infrastructure works decided by Barnsley in the last twelve months, from validation. Barnsley decision record →

Consultation & key dates

Comments by
11 Dec 2026
Env. assessment
No
Barnsley
Planning Authority Score
4.1/10
Below average
#189 of 296 overall
Relevant to this application:
Householder decisions

Barnsley is slower than most councils at deciding householder applications: #252 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barnsley decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #74 of 296
94%
Householder approved
Above avg (90%) #98 of 296
45%
Decided in 8 weeks
Below avg (63%) #252 of 296
44%
Extended time limit
Above avg (41%) #174 of 296
97%
Minor dwellings approved
76 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
80%
Change of use approved
54 decided
673
Total decisions
53 refused in the year to March 2026