Land at the Stores, Pant Y Dwr, Rhayader, Powys Data via plota.co.uk

P/26/0639/FUL - Full planning permission Under Consultation

Proposal

Erection of 2 dwellings subsequent to the demolition of an existing building, installation of package treatment plant, access improvements and change of use of an existing building (to ancillary domestic) to serve 1 of the dwellings together with associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Jun 2026
✓
Validated
17 Jul 2026
Decision
Target date was 11 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Powys's recent new homes.

Site constraints 3

Nutrient neutrality catchment: River Wye
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
LD6 5LN
Received
24 Jun 2026
Validated
17 Jul 2026
Ward
Llanyre;Nantmel
Parish
St. Harmon
Case officer
Show
Target decision
11 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
BP&A Limited Sam Bartholomew

Decision outlook

Day 129, past the statutory target. 42% of new homes in Powys are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 12973 days past the 56-day target
13%decided within 8 weeks
82%approved
6%go to committee

Plota live figures for new homes decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

7comments received
7 neutral

Last counted 21 Nov 2026

Read the comments on the council site ↗