Land At Slate House Canister Lane Frithville Lincolnshire Data via plota.co.uk

00887/26/FUL - Full Planning Permission Approved

Proposal

Planning Permission - Change of use of part of existing workshop to form a farm shop, siting of a portable toilet and re-siting of existing storage container. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jun 2026
✓
Validated
11 Jun 2026
✓
Consultation
15 Jun 2026
✓
Approved
14 Aug 2026

Approved on 14 Aug 2026 · Delegated Decision · Last checked 15 Aug 2026

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Triton Knoll Electrical System
The site is inside the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, the site is inside its boundary); Grimsby to Walpole (at pre-application, 186 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE22 7HQ
Received
1 Jun 2026
Validated
11 Jun 2026
Ward
Sibsey And Stickney Ward
Parish
Frithville And Westville
Case officer
Show
Target decision
6 Aug 2026
Decision
Approved
Decision date
14 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Neil Dowlman Architecture Ltd

How this decision compares

Decided in 64 days from validation, 8 days slower than East Lindsey's median of 56 for changes of use. Approved, as 91% of changes of use here are.

52%decided within 8 weeks
91%approved
102decided in the last year

Plota live figures for changes of use decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 15 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14953389
Planning Portal ref
PP-14953389
Neighbours
15 Jun 2026
Consultation
15 Jun 2026
Comments by
21 Jul 2026
Site or press notice
30 Jun 2026
Statutory expiry
6 Aug 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Change of use

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026