Lancarffe Bodmin Cornwall PL30 4HU Data via plota.co.uk

PA26/03811 - Full application Awaiting decision

Proposal

Swale and sewage treatment plant Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2026
✓
Consultation
23 Jun 2026
Decision
Expected by 12 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 114.

The consultation period closed on 14 Jul 2026.

Site constraints 7

Grade II* listed: Lancarffe
List entry 1146396 · 0 m away · 2 more listed buildings within 150 m (1 Grade II*, 1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Nutrient neutrality catchment: River Camel SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Scheduled monument 12 m away: An early Christian memorial stone at Lancarffe
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project 1975 m away: A30 Temple to Higher Carblake Improvement; Priority habitat 20 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £750,000 in March 2021. Detached house, freehold.

2 March 2021£750,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL30 4HU
Received
17 Jun 2026
Validated
17 Jun 2026
Ward
Lanivet, Blisland And Bodmin St Lawrence
Parish
Helland
Case officer
Show
Target decision
12 Aug 2026
Applicant
Show
Agent
Jonathan Rhind Architects

Decision outlook

Day 114, past the statutory target. 85% of utility and infrastructure works in Cornwall are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 11458 days past the 56-day target
66%decided within 8 weeks
98%approved
343decided in the last year

Plota live figures for utility and infrastructure works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14882734
Planning Portal ref
PP-14882734
Comments by
14 Jul 2026
Site or press notice
23 Jun 2026
Statutory expiry
12 Aug 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.