Revised railway bridges at Old Oak Common Lane (between Wells House Road and Wormwood Scrubs)
Summary of planning committee decision
Decided by Old Oak Park Royal OPDC Planning Committee on 26 Feb 2026.
What was proposed
The application proposed widened replacement and new railway bridges, IEP bridge modifications, a collision beam, earthworks and track-level fencing.
“Application reference 26/0002/HS2OPDC Site address Old Oak Common Lane (between Wells House Road and Wormwood Scrubs), London, NW10 6DZ Proposal Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017, for works related to the replacement Great Western Mainline Bridge; a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of the existing Intercity Express Programme…”
Officer report
The site
The site lies on Old Oak Common Lane between Wells House Road and Wormwood Scrubs, where existing railway bridges span the road.
“The application site is located on Old Oak Common Lane between Wells House Road to the north and Wormwood Scrubs to the south. The site as existing comprises the Great Western Mainline (GWML) bridge and the Intercity Express Programme (IEP) Depot bridge. The former Wycombe line bridge (to the north) has been demolished since the previous Schedule 17 approvals. The extent of the application site is shown in Figure 3.2 below.”
“The GWML and IEP Depot bridges all span Old Oak Common Lane and are located to the south-east of Wells House Road. Beneath the GWML and IEP Depot bridges, Old Oak Common Lane has a single footpath on the western side.”
Officer report
Earlier approvals
Earlier Schedule 17 consents for iterations of the railway bridges were approved in 2021 and 2023.
“22/0064/HS2OPDC Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017 for works associated with the urban realm for the new Old Oak Common station comprising earthworks; wetland area earthworks; retaining walls; bus canopies; fences and walls; bollards; seating; planters; cycle stands; lighting equipment; a DNO substation; hard and soft landscaping; road vehicle parks and onsite road layout. Application approved on 11 July 2022.”
“Planning Committee has previously resolved to grant Schedule 17 consents for two earlier iterations of the railway bridges proposed in the current application, under application refs 20/0011/HS2OPDC (May 2020) and 23/0020/HS2OPDC (June 2023).”
Officer report
Consultation responses
Statutory and local authority consultees raised no objections, while Network Rail supported the application subject to its asset protection process.
“The following non-statutory consultees and stakeholders were consulted on the application and their responses are summarised below. Copies of the full representations have been circulated to Members and are available at the online planning register: https://planning.agileapplications.co.uk/opdc…”
“Consultee Summary of response Officer response London Borough of Brent (LBB) No objection. Noted. London Borough of Ealing (LBE) No objection. LBE is satisfied that the proposal would not be likely to represent a direct conflict with Ealing Council’s strategic plan for the borough. Noted. Network Rail Network Rail are supportive of the above application. The works should be undertaken through Network Rail’s Asset Protection Process. Noted.”
Officer report
Public objections
Two members of the public objected to bridge widths, the existing depot bridge and future road, footway and cycleway arrangements.
“The location of the existing IEP Depot bridge creates a limitation on the width of the proposed GWML bridge where the two bridges interface with one another. The replacement or removal of the IEP Depot bridge does not form part of HS2’s scope and the main structure will remain in place for the foreseeable future. The bridge is still required for train cleaning and maintenance activities, and train stabling and shunting.”
“In addition, future plans for the IEP Depot are not a relevant consideration in this application. Concern about the future highway layout of Old Oak Common Lane (footway and cycleway) in terms of their layout and widths, and potential road safety impacts that may arise.”
Officer report
Presentations and speakers
The Director of Planning introduced the application, and the Senior Planning Officer presented the site, consultation, design changes and assessment.
The decision
Conditional approval was granted, with authority delegated to finalise conditions and issue the Schedule 17 consent.
“Resolve to grant conditional approval and delegate authority to the Director of Planning to:”
“(a) Finalise the recommended conditions as set out in this report including such refinements, amendments, additions and/or deletions as the Director of Planning considers reasonably necessary provided that the Director of Planning is satisfied that any such changes could not reasonably be regarded as deviating from the overall principle of the decision reached by the committee nor that such change(s) could reasonably have led to a different decision having been reached by…”
Officer report
The decision
“The Planning Committee (Unanimously) 6.7.1 To Grant conditional approval and delegate authority to the Director of Planning to: a) The planning conditions as set out in Appendix 1 to this report; and b) Issue the Schedule 17 consent. 7 Harlesden Neighbourhood Forum Re-Designation (Item 7) 7.1 The Planning Committee was requested to recommend to the Board the redesignation of the Harlesden Neighbourhood Forum. 7.2 Tom Cardis, Head of Planning Policy, gave a presentation highlighting the following: 7.2.1 The legal requirements for the application including the name of the forum; copy of the forum’s constitution; map of the neighbourhood area; contact details; and statement explaining how the proposed neighbourhood forum meets the conditions contained in section 61F (5) of the 1990 Act. 7.2.2 The consultation process and responses received from residents. 7”
Minutes, 26 Feb 2026
Councillors at the meeting
- William HillChairFor
- Anne OgundiyaFor
- Eleanor YoungFor
- Hannah DavidFor
- Matt KelcherLabourFor
- Natalia PerezLabourFor
- Praveen AnandLabourFor
- Sarah CouttsFor
- Yvonne JohnsonLabourFor
- Wesley HarcourtLabourFor
From a unanimous vote of the 10 members present for this item.
Source: Plota analysis of the council's minutes; parties from Democracy Club.
Sources
- Old Oak Park Royal OPDC Planning Committee minutes, 26 February 2026
- Agenda and papers (council website)
Source: Plota analysis of Old Oak Park Royal's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- Old Oak Park Royal
- Date
- Thursday 26 February 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Councillors
- 10Labour 55 otherShow votes
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Old Oak Park Royal committee decisions →
This committee's year
5 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.