UNIT B Prologis Park STOCKLEY ROAD WEST DRAYTON UB7 9FN Data via plota.co.uk

18399/APP/2026/2255 Undecided

Proposal

Details pursuant to the discharge of Conditions 5 (Contamination) of planning permission ref. 18399/APP/2026/586, dated 05-06-26 (Additional access into the site at the front, with widening of the existing access road with fencing; erection of a canopy and welfare unit to the front; lowered concrete yard area with 3 x dock doors and wheel guides; 1 x level loading door; installation of fencing and bollards, and an additional waste area) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
Decision
Expected by 16 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 16 Nov 2026.

Site constraints 6

3 Article 4 directions
Residential extensions · Construction of new dwellinghouses in employment areas · Changes of use from commercial, business and service uses to dwellinghouses. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Hillingdon AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 406 m away: M4 Junctions 3 to 12 Smart Motorway
The site is about 406 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Expansion of Heathrow Airport (Third Runway) (at pre-application, about 395 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hillingdon built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hillingdon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hillingdon
Postcode
UB7 9FN
Received
21 Sept 2026
Validated
21 Sept 2026
Ward
PINKWELL 2022
Case officer
Show
Target decision
16 Nov 2026
Agent
Associate Chris Kirby
Hillingdon
Planning Authority Score
3.5/10
Below average
#219 of 296 councils
Relevant to this application:
Householder decisions

Hillingdon ranks #194 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hillingdon decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #208 of 296
90%
Householder approved
Above avg (90%) #191 of 296
58%
Decided in 8 weeks
Below avg (63%) #194 of 296
45%
Extended time limit
Above avg (41%) #190 of 296
61%
Minor dwellings approved
67 decided (1-9 homes)
65%
Change of use approved
17 decided
1,680
Total decisions
255 refused in the year to March 2026