Unit 10 - Mcdonalds Restaurants Snipe Retail Park Snipe Way Ashton-under-lyne Tameside OL7 0DN Data via plota.co.uk

25/00635/FUL - Full Planning Permission Approved

Proposal

Proposal for the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of McDonalds, including one fully accessible EV charging bay. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Aug 2025
✓
Consultation
27 Aug 2025
✓
Approved
19 Sept 2025

Approved on 19 Sept 2025 · Delegated Decision · Last checked 16 Oct 2026

Documents 19

All documents on the council site ↗

Site constraints 4

Also on the record
1 listed building within 150 m; Coalfield, development low risk area; Inside the Audenshaw built-up area; Air quality management area 27 m away: Tameside AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area302 m² (3,251 sq ft)
Energy ratingE (asset rating 112)
UseA3/A4/A5 Restaurant and Cafes/Drinking Establishments and Hot Food takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in April 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tameside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tameside
Application type
Full Planning Permission
Postcode
OL7 0DN
Received
1 Aug 2025
Validated
1 Aug 2025
Ward
Ashton-under-Lyne St Peters
Parish
Ashton-under-lyne
Case officer
Show
Target decision
26 Sept 2025
Decision
Approve
Decision date
19 Sept 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 49 days from validation, 7 days faster than Tameside's median of 56 for full applications. Approved, as 85% of full applications here are.

61%decided within 8 weeks
85%approved
481decided in the last year

Plota live figures for full applications decided by Tameside in the last twelve months, from validation. Tameside decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14212999
Planning Portal ref
PP-14212999
Comments by
17 Sept 2025
Site or press notice
27 Aug 2025
Statutory expiry
26 Sept 2025
Env. assessment
No
Tameside
Planning Authority Score
6.4/10
Average
#85 of 296 overall
Relevant to this application:
Householder decisions

Tameside is faster than most councils at deciding householder applications: #60 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tameside decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #199 of 296
94%
Householder approved
Above avg (90%) #121 of 296
77%
Decided in 8 weeks
Above avg (63%) #60 of 296
39%
Extended time limit
Below avg (41%) #145 of 296
52%
Minor dwellings approved
31 decided (1-9 homes)
94%
Major dwellings approved
18 decided (10+ homes)
63%
Change of use approved
78 decided
561
Total decisions
80 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.