Fulham Palace Bishop's Avenue London SW6 6EA Data via plota.co.uk

2025/02880/FUL - Full Planning Application Approved

Proposal

External repairs and re-roofing across various areas within the Tudor Courtyard and Chapel to the Grade I listed Palace building and the Grade II listed Chapel. Works to consist of renewal of roof finishes where most deteriorated, to the South Range roof and Great Hall roof (west slope); works to repair/redecorate/upgrade and improve detailing to windows and doors to the South Range, including the renewal of the dormer and 2 no. windows at ground floor level; various masonry repairs, particularly to decorative elements of the Chapel, and significant cracking to the South Range; fire upgrades to the South Range roof and Great Hall roofspace where existing compartment lines are damaged and have been identified as high risk areas within the Palace Fire Strategy; removal of redundant services in the roof voids, which in turn reduces the fire load in these areas; upgrade and enlargement of Rainwater goods along with new water butts, within the scope areas to better cope with and futureproof for increased rainfall, and water management across the site; and improvements to drainage are also proposed to reduce risk of flooding in areas that have previously flooded and have been prone to movement. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Oct 2025
✓
Validated
17 Oct 2025
✓
Approved
12 Dec 2025

Approved on 12 Dec 2025 · Last checked 12 Oct 2026

Documents 77

Plans & drawings 65

PDF 174 (GA)212 PROPOSED SECTION CC Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)213 PROPOSED SECTION DD Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)222 PROPOSED ELEVATION 3 (COURTYARD) Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)223 PROPOSED ELEVATION 4 (COURTYARD) Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)225 PROPOSED ELEVATION 7 (SOUTH_EAST RANGE) Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)226 PROPOSED ELEVATION 8-9 (SOUTH_EAST RANGE) Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)229 PROPOSED ELEVATION 12 (EXTERNAL TUDOR QUAD) Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)204 PROPOSED ROOF VOIDS PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)205 PROPOSED CHAPEL GF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)206 PROPOSED CHAPEL ROOF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)207 PROPOSED SOUTH_EAST RANGE ROOF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)208 PROPOSED GREAT HALL ROOF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)209 PROPOSED NORTH RANGE ROOF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)210 PROPOSED SECTION AA Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)125 EXISTING ELEVATION 7 (SOUTH_EAST RANGE) WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)126 EXISTING ELEVATION 8-9 (SOUTH_EAST RANGE) WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)129 EXISTING ELEVATION 12 (EXTERNAL TUDOR QUAD) WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)200 PROPOSED GROUND FLOOR PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)201 PROPOSED LOWER FIRST FLOOR PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)202 PROPOSED UPPER FIRST FLOOR PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)203 PROPOSED ROOF PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)106 EXISTING CHAPEL ROOF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)107 EXISTING SOUTH_EAST RANGE ROOF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)108 EXISTING GREAT HALL ROOF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)109 EXISTING NORTH RANGE ROOF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)110 EXISTING SECTION AA WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)112 EXISTING SECTION CC WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)113 EXISTING SECTION DD WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)122 EXISTING ELEVATION 3 (COURTYARD) WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)123 EXISTING ELEVATION 4 (COURTYARD) WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)231 PROPOSED CHAPEL ELEVATIONS 1-2 Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)232 PROPOSED CHAPEL ELEVATIONS 3-4 Drawing · 16 Oct 2025 View ↗ PDF 174 (GA)003 PROPOSED SITE PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)131 EXISTING CHAPEL ELEVATIONS 1-2 WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF CIL FORM_251016 Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)312 STANDARD LEAD DETAILS Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)313 STANDARD LEAD DETAILS Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)132 EXISTING CHAPEL ELEVATIONS 3-4 WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)002 SITE ACCESS AND LOGISTICS Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)100 EXISTING GROUND FLOOR PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)101 EXISTING LOWER FIRST FLOOR PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)102 EXISTING UPPER FIRST FLOOR PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)103 EXISTING ROOF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)104 EXISTING ROOF VOIDS PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)105 EXISTING CHAPEL GF PLAN WITH DEMOLITION Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)301 DORMER WINDOW RENEWAL - SECTION Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)302 CHIMNEY RENEWAL CH1-CH2 Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)303 CHIMNEY RENEWAL CH3 Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)304 CHIMNEY RENEWAL CH4-CH5 Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)305 CHAPEL FINIAL REPLACEMENT Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)306 CHAPEL FINIAL REPLACEMENT - CORNICE STONE Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)307 VALLEY EAVES GUTTER - PLANS Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)308 VALLEY EAVES GUTTER - SECTION AND HOPPER DETAIL Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)309 RIDGE GUTTER DETAIL Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)310 WINDOW REPAIRS_TYPE_B1_B2 Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)311 WINDOW REPAIRS_TYPE A_D Drawing · 16 Oct 2025 View ↗ PDF APPENDIX D - FIRE ENGINEER STAGE 3 REPORT Drawing · 16 Oct 2025 View ↗ PDF APPENDIX C - ME DESIGN STAGE 3 INFORMATION Drawing · 16 Oct 2025 View ↗ PDF APPENDIX B - STRUCTURAL AND CIVIL ENGINEER STAGE 3 INFORMATION Drawing · 16 Oct 2025 View ↗ PDF APPENDIX A_LISTING DESCRIPTIONS Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)315 FIRE UPGRADES TO COMPARTMENTS Drawing · 16 Oct 2025 View ↗ PDF 174 (DT)300 DORMER WINDOW RENEWAL - PLAN ELEVATION Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)000 LOCATION PLAN Drawing · 16 Oct 2025 View ↗ PDF 174 (EX)001 EXISTING SITE PLAN Drawing · 16 Oct 2025 View ↗ PDF APPENDIX K - FULHAM PALACE HE PRE-APPLICATION ADVICE REPORT Drawing · 16 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 11

Grade I listed: Fulham Palace
List entry 1286903 · 28 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Registered park or garden: Fulham Palace
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Bishops Park conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 5 m away: Fulham Palace moated site
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Priority habitat 33 m away: Deciduous woodland.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 6EA
Received
16 Oct 2025
Validated
17 Oct 2025
Ward
Palace And Hurlingham
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
12 Dec 2025
Applicant
Show
Freehold owner
Show

How this decision compares

Decided in 56 days from validation, 21 days faster than Hammersmith and Fulham's median of 77 for full applications. Approved, as 98% of full applications here are.

28%decided within 8 weeks
98%approved
759decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
21 Oct 2025
Comments by
12 Dec 2025
Site or press notice
29 Oct 2025
Statutory expiry
12 Dec 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.