1 Embankment Place London WC2N 6RH Data via plota.co.uk

26/05097/FULL - Full Planning Permission Application Pending

Proposal

Alterations to the existing building to provide a new extension to Villers Street; partial facade replacement and new external terraces; roof level extensions; refurbishment and associated alterations; public realm and highway works; and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Validated
6 Aug 2026
✓
Consultation
10 Aug 2026
Decision
Expected by 5 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 64.

The consultation period closed on 9 Sept 2026.

Documents 40

Statements & assessments 22

PDF BNG METRIC TOOLS Background Papers · 6 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF AIR QUALITY ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF ARCHAEOLOGICAL DESK BASED ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF BNG ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF DRAINAGE STRATEGY REPORT Background Papers · 31 Jul 2026 View ↗ PDF ENERGY STRATEGY Background Papers · 31 Jul 2026 View ↗ PDF FIRE STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF LIGHT POLLUTION ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF ECOLOGICAL APPRIASAL Background Papers · 31 Jul 2026 View ↗ PDF FLOOD RISK ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF PLANNING STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF SOCIO-ECONOMIC BENEFITS STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Background Papers · 31 Jul 2026 View ↗ PDF STRUCTURAL METHODOLOGY STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF TRANSPORT ASSESSMENT Background Papers · 31 Jul 2026 View ↗ PDF UTILITIES STATEMENT Background Papers · 31 Jul 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT Background Papers · 31 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Trafalgar Square conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 60 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: City of Westminster APA 1.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
42 listed buildings within 150 m
Nearest: Playhouse Theatre, Grade II, 13 m away · 3 Grade I, 12 Grade II*, 26 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 42 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Registered park or garden 69 m away: Victoria Embankment Gardens
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
WC2N 6RH
Received
29 Jul 2026
Validated
6 Aug 2026
Ward
St James's
Case officer
Show
Target decision
5 Nov 2026
Agent
DP9 Ltd
Leaseholder
Show

Decision outlook

Day 64, past the statutory target. 83% of commercial and major works in Westminster are decided within thirteen weeks, which runs to 5 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 5 Oct 2026.

Day 648 days past the 56-day target
52%decided within 8 weeks
92%approved
234decided in the last year

Plota live figures for commercial and major works decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

8comments received
7 objecting1 supporting

88% object · above the UK average of 74%

397 neighbours consulted · Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15107397
Planning Portal ref
PP-15107397
Comments by
9 Sept 2026
Site or press notice
10 Aug 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.