80B High Street Lockerbie DG11 2EU Data via plota.co.uk

26/1712/UTL - Utilities Consultation Assessment Stage

Proposal

Installation of 1no. Block terminal with all associated wiring and cables Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Sept 2026
✓
Validated
30 Sept 2026
Decision
Expected by 25 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 17 Nov 2026 and 1 Dec 2026, from Dumfries's recent utility and infrastructure works.

Site constraints 1

21 listed buildings within 150 m of the postcode pin
Nearest: 82-86 High Street, Lockerbie, Grade C, about 7 m from the postcode pin · 1 Grade A, 11 Grade B, 9 Grade C
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 21 with distances
Historic Environment Scotland ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dumfries - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dumfries
Application type
Utilities Consultation
Postcode
DG11 2EU
Received
28 Sept 2026
Validated
30 Sept 2026
Ward
Annandale North
Parish
Lockerbie & District Community Council
Applicant
Show

Decision outlook

Day 4 of the 56-day target. Dumfries usually decides utility and infrastructure works by day 57.

Day 453 days to the predicted decision (day 57)
46%decided within 8 weeks
94%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Dumfries in the last twelve months, from validation. Dumfries decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No