71-73 Poulton Street Kirkham Lancashire PR4 2AJ Data via plota.co.uk

25/0471 - Full Planning Permission Approved

Proposal

Installation of replacement shopfront to both properties and installation of 2 no. vents to rear associated with air handling equipment (part-retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2025
✓
Validated
5 Sept 2025
✓
Approved
5 Nov 2025

Approved on 5 Nov 2025 · Delegated · Last checked 12 Oct 2026

Site constraints 3

4 listed buildings within 150 m of the postcode pin
Nearest: Jubilee Lamp, Grade II, about 37 m from the postcode pin · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
National infrastructure project about 908 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 908 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Kirkham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fylde - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fylde
Application type
Full Planning Permission
Postcode
PR4 2AJ
Received
6 Aug 2025
Validated
5 Sept 2025
Ward
Kirkham
Parish
Kirkham
Case officer
Show
Decision
Granted
Decision date
5 Nov 2025
Decision level
Delegated
Applicant
Show
Agent
Ridge & Partners LLP

How this decision compares

Decided in 61 days from validation, 18 days faster than Fylde's median of 79 for full applications. Approved, as 95% of full applications here are.

34%decided within 8 weeks
95%approved
8%go to committee

Plota live figures for full applications decided by Fylde in the last twelve months, from validation. Fylde decision record →

Consultation & key dates

Consultation
8 Sept 2025
Comments by
29 Sept 2025
Fylde
Planning Authority Score
5.3/10
Average
#130 of 296 overall
Relevant to this application:
Householder decisions

Fylde is #184 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Fylde decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #11 of 296
98%
Householder approved
Above avg (90%) #17 of 296
60%
Decided in 8 weeks
Below avg (63%) #184 of 296
49%
Extended time limit
Above avg (41%) #220 of 296
79%
Minor dwellings approved
43 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
100%
Change of use approved
28 decided
422
Total decisions
16 refused in the year to March 2026