Land Adjacent 4C Donkey Alley London Southwark SE22 0NY Data via plota.co.uk

26/AP/2816 - Minor application Under consideration/assessment

Proposal

Erection of one five-bedroom, four-storey new build dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Sept 2026
✓
Validated
7 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Nov 2026 and 23 Dec 2026, from Southwark's recent new homes.

Documents 22

All documents on the council site ↗

Site constraints 7

Tree preservation order: Donkey Alley
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Southwark built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land about 34 m away; Priority habitat about 27 m away: Traditional orchard.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Minor application
Postcode
SE22 0NY
Received
24 Sept 2026
Validated
7 Oct 2026
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show
Agent
Edgley Design

Decision outlook

Day 47 of the 56-day target. Southwark usually decides new homes by day 55.

Day 479 days to the 56-day target
52%decided within 8 weeks
81%approved
84decided in the last year

Plota live figures for new homes decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

12comments received
12 objecting

100% object · above the UK average of 74%

17 neighbours consulted · Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Dec 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026