Land West Of Silbury Road Bristol Data via plota.co.uk

26/12250/COND - Approval/Discharge of conditions Pending consideration

Proposal

Application for approval of details reserved by condition nos. 14 (CEMP), 15 (Invasive Species) and 18 (EMES) of permission - Outline planning permission with some matters reserved - for phased residential-led development including affordable homes and commercial/community floorspace (Use Classes E and F.2), amenity green spaces; natural and semi natural greenspace; provision of associated infrastructure including footpaths/cycleways and new vehicular and emergency accesses; and provision of associated engineering and landscaping work including SUDs. Approval sought for access with all other matter reserved. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 May 2026
Decision
Expected by 23 Jul 2026

Under consideration

No decision has been issued yet. A decision is expected by 23 Jul 2026.

The consultation period closed on 2 Jul 2026.

Associated applications 8

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
National infrastructure project about 338 m away: Portishead Branch Line - MetroWest Phase 1
The site is about 338 m from the project boundary. Railway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the Bristol built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Approval/Discharge of conditions
Received
28 May 2026
Validated
28 May 2026
Ward
Bedminster
Parish
Greater Bedminster Community Partnership
Target decision
23 Jul 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 4 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14966679
Planning Portal ref
PP-14966679
Comments by
2 Jul 2026
Statutory expiry
23 Jul 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026