Cedar Court 47 Outram Road Southsea Data via plota.co.uk

26/00707/FUL - Full Application Awaiting decision

Proposal

Replacement rear communal area walkway balustrading at ground, first, second and third floor levels Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Jun 2026
Validated
18 Jun 2026
Consultation
6 Jul 2026
Decision
Expected by 13 Aug 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 14 Sept 2026; it is now day 88. The consultation period closed on 3 Aug 2026.

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Campbell Road, Southsea conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO5 1QS
Received
17 Jun 2026
Validated
18 Jun 2026
Ward
Central Southsea
Target decision
13 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Philip J Harrison Building Surveyors Ltd

Decision outlook

Day 88, past the statutory target. 88% of extensions in Portsmouth are decided within thirteen weeks, which runs to 17 Sept 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 8832 days past the 56-day target
62%decided within 8 weeks
86%approved
197decided in the last year

Plota live figures for extensions decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

1comment received
1 neutral

71 neighbours consulted · Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15012499
Neighbours
6 Jul 2026
Consultation
6 Jul 2026
Comments by
3 Aug 2026
Site or press notice
3 Jul 2026
Statutory expiry
13 Aug 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026