154 Clarence Street Kingston Upon Thames KT1 1QP Data via plota.co.uk

25/02253/NOT - PD Notification - Telecoms Decided

Proposal

Installation of fixed line broadband electronic communications apparatus, detailed as (Install approx. 50m of COF250/12F external cable up wall in existing trunking and cleat along wall 50m to rear of building and provide externa hole into comms area and Fit FSP on wall and provide 5m pigtails to cabinet ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2025
✓
Acknowledgement Sent
24 Sept 2025

Acknowledgement Sent on 24 Sept 2025 · Delegated Decision · Last checked 14 Oct 2026

Site constraints 6

Grade II listed: Former Granada Cinema
List entry 1358456 · The pin is inside its outline · 10 more listed buildings within 150 m (1 Grade II*, 5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 10 with distances
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Kingston
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Kingston upon Thames built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area3,979 m² (42,830 sq ft)
Energy ratingC (asset rating 70)
UseGeneral Assembly and Leisure, Night Clubs, and Theatres
HeatingAir Conditioning

From the energy performance certificate lodged in September 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
PD Notification - Telecoms
Postcode
KT1 1QP
Received
27 Aug 2025
Validated
27 Aug 2025
Ward
Kingston Town
Parish
Kingston And North Kingston
Case officer
Show
Target decision
24 Sept 2025
Decision
Acknowledgement Sent
Decision date
24 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Venkatesh GJ

Public comments

No public comments yet.

Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Sept 2025
Env. assessment
No
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.