Land adj. to 168 Lammack Road, Blackburn Data via plota.co.uk

3/2026/0691 - Observations to Another Local Authority Decided - Final Decision

Proposal

Consultation on Blackburn with Darwen outline planning application for proposed erection of detached 2.5 storey dwelling and associated car parking with all matters reserved Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Sept 2026
✓
Validated
11 Sept 2026
Decision
Target date was 6 Nov 2026

Under consideration

No decision has been issued yet. The council's target date, 6 Nov 2026, has passed.

Site constraints 6

Public footpath 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Blackburn (Blackburn with Darwen) built-up area; Green belt 32 m away: Merseyside and Greater Manchester; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ribble Valley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Observations to Another Local Authority
Received
7 Sept 2026
Validated
11 Sept 2026
Ribble Valley
Planning Authority Score
3.4/10
Poor
#222 of 296 overall
Relevant to this application:
Householder decisions

Ribble Valley is slower than most councils at deciding householder applications: #212 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Ribble Valley decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #241 of 296
91%
Householder approved
Above avg (90%) #179 of 296
55%
Decided in 8 weeks
Below avg (63%) #212 of 296
45%
Extended time limit
Above avg (41%) #194 of 296
64%
Minor dwellings approved
58 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
59%
Change of use approved
51 decided
520
Total decisions
89 refused in the year to March 2026