Scott Street Bridge And Approaches, Scott Street, Kingston Upon Hull Data via plota.co.uk

26/00742/S19 - Listed Building vary a condition Pending Consideration

Proposal

Application to vary condition 6 of approval ref. : From: - Prior to the new bridge leafs being installed plans to a scale of not less than 1:20 showing the proposed new permanent stainless steel parapet railings with etched interpretation panels shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out and thereafter retained as approved (to ensure the details of the proposal can be fully assessed before they are implemented to ensure a satisfactory quality of development which complies with policy 16 of the Local Plan). To: - Prior to the new bridge leafs being installed plans to a scale of not less than 1:20 showing the proposed new permanent railings shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out and thereafter retained as approved (to ensure the details of the proposal can be fully assessed before they are implemented to ensure a satisfactory quality of development which complies with policy 16 of the Local Plan). Original consent - - Listed Building Consent for:- The dismantling of Scott Street Bridge and provision of a scheme for replacement leafs and enhancement and conservation of the bridge approaches. (Revised Proposal) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
Decision
Expected by 23 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 23 Sept 2026.

The consultation period closed on 2 Sept 2026.

Associated applications 3

  • Part of

    VariationApprovedcouncil archive

    Conditions 6 variation sought

    • VariationApplication to vary condition 6 - From: - Prior to the new bridge leafs being installed plans…This application26/00742/S19
  • Listed buildingApprovedcouncil archive

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 715 m away: A63 Castle Street Improvement-Hull
The site is 715 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Listed Building vary a condition
Received
29 Jul 2026
Validated
29 Jul 2026
Ward
Central
Case officer
Show
Agent
Innovation Architecture Ltd

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15119699
Planning Portal ref
PP-15119699
Comments by
2 Sept 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Other decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026