48 Chapel Street London NW1 5DH Data via plota.co.uk

25/05317/ADFULL - Approval of Details (Full PP) Approved

Proposal

Detailed design and method statements to Condition 5 of planning permission dated 07 October 2022 (RN ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2025
✓
Validated
21 Aug 2025
✓
Approved
12 Mar 2026

Approved on 12 Mar 2026 · Complex Delegated Decision · Last checked 31 Oct 2026

Documents 18

All documents on the council site ↗

Associated applications 5

Site constraints 10

Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
9 listed buildings within 150 m
Nearest: K2 Telephone Kiosk, the Western of Pair at South Side of Junction With Chapel Street, Grade II, 59 m away · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Also on the record
Conservation area 61 m away: Portman Estate; National infrastructure project 578 m away: London Strategic Heat Main Project, at pre-application; Registered park or garden 236 m away: The Water Gardens Designed Landscape; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 75 m away: Marylebone Road.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details (Full PP)
Postcode
NW1 5DH
Received
30 Jul 2025
Validated
21 Aug 2025
Ward
Hyde Park
Case officer
Show
Target decision
30 Nov 2025
Decision
Application Permitted
Decision date
12 Mar 2026
Decision level
Complex Delegated Decision
Agent
Savills

How this decision compares

Decided in 203 days from validation, 166 days slower than Westminster's median of 37 for discharge of conditions. Approved, as 91% of discharge of conditions here are.

67%decided within 8 weeks
91%approved
1,913decided in the last year

Plota live figures for discharge of conditions decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 31 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14216013
Planning Portal ref
PP-14216013
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 overall
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications: #258 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use