Street Record, Oxford Road, London Data via plota.co.uk

26/2101 - Full Planning Permission Registered

Proposal

Installation of district heating network pipework (Phase 1) along Oxford Road, in connection with individual building connection pipework serving two non-High-Risk Buildings (non-HRBs) within WCC in connection with the proposed South Kilburn District Heating Network Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
30 Sept 2026
Decision
Expected by 12 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 25 Nov 2026, from Brent's recent utility and infrastructure works.

Documents 34

Plans & drawings 17

PDF South kilburn heat network Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Dh red line boundary wcc Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF South kilburn dhn traffic management plan Supporting Documents · 18 Aug 2026 View ↗ PDF Dh red line boundary with dh - wcc Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Construction environmental plan Supporting Documents · 18 Aug 2026 View ↗ PDF Overall red line boundary Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Overall red line boundary Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines high school - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines high school existing elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines high school proposed elevations Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines high school proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF Location plan - st augustines high school Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines primarys school - location plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines primary school - existing site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines primary school - proposed elevation Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St augustines primary school - proposed site plan Submitted Drawings Plans · 18 Aug 2026 View ↗ PDF St sugustines primary school existing elevations Submitted Drawings Plans · 18 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 5

Article 4 direction
Article 4 for HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Conservation area about 43 m away: Maida Vale; Inside the Brent built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Full Planning Permission
Received
17 Aug 2026
Validated
30 Sept 2026
Case officer
Show
Target decision
12 Oct 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Turley

Decision outlook

Day 9 of the 56-day target. Brent usually decides utility and infrastructure works by day 56.

Day 947 days to the 56-day target
77%decided within 8 weeks
84%approved
59decided in the last year

Plota live figures for utility and infrastructure works decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15131490
Planning Portal ref
PP-15131490
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions