11B Debdale Lane Keyworth Nottinghamshire NG12 5HT Data via plota.co.uk

26/01377/FUL - Full Application Pending Decision

Proposal

Insertion of a rooflight to the rear elevation and formation of a study/bedroom and shower room within the existing roof space Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Validated
13 Aug 2026
✓
Consultation
17 Aug 2026
Decision
Expected by 8 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 57.

The consultation period closed on 8 Sept 2026.

Site constraints 2

Also on the record
Inside the Keyworth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area91 m² (980 sq ft)
Energy ratingC (77 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built2007 to 2011
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in January 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Rushcliffe - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushcliffe
Application type
Full Application
Postcode
NG12 5HT
Received
12 Aug 2026
Validated
13 Aug 2026
Ward
Keyworth And Wolds
Parish
Keyworth
Case officer
Show
Target decision
8 Oct 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 57, past the statutory target. 81% of extensions in Rushcliffe are decided within thirteen weeks, which runs to 12 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 571 days past the 56-day target
62%decided within 8 weeks
91%approved
374decided in the last year

Plota live figures for extensions decided by Rushcliffe in the last twelve months, from validation. Rushcliffe decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
17 Aug 2026
Consultation
17 Aug 2026
Comments by
8 Sept 2026
Statutory expiry
8 Oct 2026
Env. assessment
No
Rushcliffe
Planning Authority Score
3.8/10
Below average
#208 of 296 councils
Relevant to this application:
Householder decisions

Rushcliffe is slower than most councils at deciding householder applications, ranking #233 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushcliffe decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #91 of 296
95%
Householder approved
Above avg (90%) #89 of 296
51%
Decided in 8 weeks
Below avg (63%) #233 of 296
50%
Extended time limit
Above avg (41%) #227 of 296
78%
Minor dwellings approved
74 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
100%
Change of use approved
13 decided
761
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.