Proposal
Discharge of Condition No. 3 of . Condition 3 was previously discharged () The development hereby permitted shall not commence until either suitably informed risk assessments produced in accordance with LCRM guidance and/or a detailed remediation strategy for the underground fuel storage tank(s) and fuel dispensing infrastructure has been provided. The remediation strategy must be in line with current Guidance for Pollution prevention (GPP 2 and GPP 27) and the Pollution Prevention Guidance (PPG27). This strategy must be submitted in writing and agreed with the Planning Authority and should identify all the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors and human health to ensure the site is suitable for use. However the Contractor has proposed an alternative solution to the removal of the underground fuel tanks. Instead of removing the underground fuel tanks, as previously advised, the specialist subcontractor (Baltor Systems) has proposed the following alternative methodology: Diesel tank Decommissioning Draining of the existing suction lines, degassing and disconnection from the diesel pump. Disconnection of all mains cables from the 2No. Old Pumps and Fuel Management System, removal and disposal of same to facilitate the demolition of the old pump house. Removal of all pipework from the underground diesel tank and removal of tank lid to give access for cleaning and concrete foaming. Removal of all fuel residues and sludge from the underground tank, thoroughly washing same with vacuum tanker and degassing in preparation for concrete foaming. Darafil Concrete Foam Filling of tank (assumed to be 16,000 litres) with concrete foam, overflowing same into the manhole void and issuing a decommissioning certificate. Our Environmental Consultant's comments are as follows: From: Cove Environmental Consulting With regards to this issue, the retaining of the tanks on site – subject to the correct decommissioning works – would be an acceptable alternative to the removal of the tank. The remedial design report noted the tanks would be removed however the key element is the testing around and below the level of the tank itself, so if this is still carried out then we can validate the remediation of the tank – i.e. we will be able to show that there is no contamination present in the ground immediately around / below the tank and the source of any future contamination (the tank) has been dealt with. This can all be outlined in the validation report after the works are complete. If the intention is to retain the tank, then we would recommend that sampling is undertaken both before and after the decommissioning work – the “before” round will confirm that no contamination is present (as if it is then the tank may actually have to be removed to deal with it) and “after” to ensure that no contamination is caused by the remedial works themselves. Data via plota.co.uk
Application progress
Approved on 18 Mar 2026 · Last checked 1 Nov 2026
Documents 11
Decision & officer reports 2
Application forms 1
Consultation & comments 4
Other documents 4
Associated applications 6
- ConditionsDischarge of Condition No. 3. Condition 3 was previously discharged The development hereby…This applicationLA08/2025/1287/DC
Show 2 more · 1 approved, 1 decided
- Conditionsarchive
Site constraints 1
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Armagh Banbridge Craigavon - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Land adjacent and to the rear of 35 and 36 Seagoe Industrial Area, Portadown, Craigavon, BT63 5QD
Erection of 30 metre high lattice tower on concrete base, with 9 antennas, 15 re...
39 Seagoe Industrial Estate, Craigavon, BT63 5QE
Proposed extension and upgrade of the existing effluent treatment plant, includi...
Northern Ireland Electricity, 4 Annagh Drive, Portadown, Craigavon, BT63 5QJ
Erection of 2no illuminated wall mounted signs on building facade and 2no free s...
34 Seagoe Industrial Estate, Portadown, Craigavon, BT63 5QD
Erection of extension to the rear of the premises for additional storage purpose...
Important details
- Council
- Armagh Banbridge Craigavon
- Application type
- Discharge of Condition
- Postcode
- BT63 5QJ
- Received
- 15 Oct 2025
- Validated
- 15 Oct 2025
- Ward
- Craigavon Centre
- Decision
- Condition Discharged
- Decision date
- 18 Mar 2026
- Applicant
- Show
- Agent
- GM Design Associates Limited
Consultation & key dates
- Planning Portal ref
- PP-14411103
- Consultation
- 5 Feb 2026
- Comments by
- 26 Feb 2026
Historical activity at this location
5 nearby applications on record - archival context, not part of the live application.
Nearby activity
Track this application
Northern Ireland Electricity Plc, Northern Ireland Electricity, 4 Annagh Drive, Craigavon, BT63 5QJ
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Northern Ireland Electricity, Carn Industrial Estate, 4 Annagh Drive, Craigavon, BT63 5QJ
Demolition of existing NIE offices and associate mobile units with the erection of a replacement office building with new security hut and cycle shelter. Works to include road, landscaping and car parking provision (in substitution of planning approval LA08/2020/1455/F).
- Received
- 22 Nov 2023
- Decided
- 9 Sep 2024
- Outcome
- Approved
Northern Ireland Electricity 4 Annagh Drive Tarsan Portadown BT63 5QJ
Discharge of condition 3 of LA08/2023/3029/F - The development hereby permitted shall not commence until either suitably informed risk assessments produced in accordance with LCRM guidance and/or a detailed remediation strategy for the underground fuel storage tank(s) and fuel dispensing infrastructure has been provided. The remediation strategy must be in line with current Guidance for Pollution prevention (GPP 2 and GPP 27) and the Pollution Prevention Guidance (PPG27). This strategy must be submitted in…
- Received
- 4 Dec 2024
- Decided
- 23 Jan 2025
- Outcome
- Approved
Northern Ireland Electricity 4 Annagh Drive, Craigavon, BT63 5QJ
Provision of temporary parking for construction works associated with application ref LA08/2023/3029/F
- Received
- 5 Jul 2024
- Decided
- 9 Sep 2024
- Outcome
- Approved