Land South Of Seaholme Holmpton Road Hollym East Riding Of Yorkshire HU19 2QW Data via plota.co.uk

26/01804/PLF - Full Planning Permission Pending Decision

Proposal

Construction of vehicular access and erection of 1.2m high steel gate and 1.2m high perimeter fencing (Retrospective Application) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
14 Jul 2026
Validated
21 Jul 2026
Decision
Expected by 15 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 15 Sept 2026; it is now day 56. The consultation period closed on 20 Aug 2026.

Site constraints 3

Easington to Bridlington North Sands across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Special protection area 346 m away: Greater Wash.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU19 2QW
Received
14 Jul 2026
Validated
21 Jul 2026
Ward
South East Holderness
Parish
Hollym Parish Council
Case officer
Show
Applicant
Show
Agent
Thor Caithness Planning

Decision outlook

Day 56, past East Riding's usual 52 days for extensions. 99% are decided within thirteen weeks, so most likely by 20 Oct 2026.

Day 560 days to the 56-day target
98%decided within 8 weeks
90%approved
403decided in the last year

Plota live figures for extensions decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15070795
Comments by
20 Aug 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026