Site North of Blencow Quarry Quarry Lane Blencow PENRITH CA11 0DE Data via plota.co.uk

2026/0278/OPA - Outline Application Officer Consideration

Proposal

Outline application for a residential development, with all matters reserved. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Feb 2026
✓
Validated
13 Feb 2026
Decision
Target date was 10 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 22 Jun 2026; it is now day 284.

The consultation period closed on 22 Jun 2026.

Documents 27

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Newbiggin built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline Application
Postcode
CA11 0DE
Received
5 Feb 2026
Validated
13 Feb 2026
Ward
Greystoke and Ullswater
Parish
Dacre
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
SRE Associates

Decision outlook

Day 284, past the statutory target. 72% of new homes in Westmorland and Furness are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 284228 days past the 56-day target
42%decided within 8 weeks
80%approved
84decided in the last year

Plota live figures for new homes decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
24 Feb 2026
Comments by
22 Jun 2026
Statutory expiry
10 Apr 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Major dwellings

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026