Flying Horse Flat 78 Waterloo Road Blyth Northumberland NE24 1DG Data via plota.co.uk

26/02930/FUL - Full Application Registered

Proposal

Change of use from first floor residential unit over public house to beauticians Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
18 Aug 2026
✓
Consultation
19 Aug 2026
Decision
Expected by 15 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Oct 2026 and 26 Oct 2026, from Northumberland (County)'s recent changes of use.

The consultation period closed on 9 Sept 2026.

Site constraints 7

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Conservation area 16 m away: Blyth Bondicar Terrace
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 969 m away: Port Blyth New Biomass Plant
The site is 969 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
4 listed buildings within 150 m; Radon affected area, class 2; Inside the Blyth (Northumberland) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (County) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
NE24 1DG
Received
17 Aug 2026
Validated
18 Aug 2026
Ward
Croft
Parish
Blyth
Case officer
Show
Target decision
15 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 54 of the 56-day target. Northumberland (County) usually decides changes of use by day 60.

Day 546 days to the predicted decision (day 60)
44%decided within 8 weeks
82%approved
155decided in the last year

Plota live figures for changes of use decided by Northumberland (County) in the last twelve months, from validation. Northumberland (County) decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
19 Aug 2026
Consultation
19 Aug 2026
Comments by
9 Sept 2026
Statutory expiry
15 Sept 2026
Env. assessment
No
Northumberland (County)
Planning Authority Score
3.8/10
Below average
#207 of 296 councils
Relevant to this application:
Change of use

Northumberland (County) ranks #167 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (County) decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #158 of 296
91%
Householder approved
Above avg (90%) #178 of 296
62%
Decided in 8 weeks
Below avg (63%) #167 of 296
47%
Extended time limit
Above avg (41%) #210 of 296
80%
Minor dwellings approved
223 decided (1-9 homes)
89%
Major dwellings approved
36 decided (10+ homes)
86%
Change of use approved
71 decided
2,013
Total decisions
233 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use