28 Coxtie Green Road Pilgrims Hatch South Weald Essex CM14 5PT Data via plota.co.uk

26/01182/S191 - Certificate of Lawfulness (existing) Pending Consideration

Proposal

Application for a Lawful Development Certificate for an existing use or development for breach of use of agricultural land as residential curtilage in excess of 10 years Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 13 Oct 2026
Decision
Expected by 8 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 8 Dec 2026.

Documents 7

Other documents 3

PDF Name hidden Show Supporting Documents · 13 Oct 2026 View ↗
PDF Name hidden Show Supporting Documents · 13 Oct 2026 View ↗
PDF Name hidden Show Supporting Documents · 13 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 4

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
1 listed building within 150 m
Nearest: Gate House, Grade II, 44 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Inside the Brentwood built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area240 m² (2,583 sq ft)
Energy ratingC (71 out of 100), could reach B
PropertyDetached house, 7 habitable rooms
Built2012 onwards
HeatingBoiler and radiators, oil
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in December 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Brentwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brentwood
Application type
Certificate of Lawfulness (existing)
Postcode
CM14 5PT
Received
around 13 Oct 2026
Validated
13 Oct 2026
Ward
Brizes, Stondon Massey And South Weald
Case officer
Show
Target decision
8 Dec 2026
Applicant
Show
Agent
Whirledge and Nott

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15272227
Planning Portal ref
PP-15272227
Statutory expiry
8 Dec 2026
Env. assessment
No
Brentwood
Planning Authority Score
0.9/10
Poor
#294 of 296 overall
Relevant to this application:
Householder decisions

Brentwood is one of the slowest councils in England for householder decisions: #278 of 296 on speed. The council extends the time limit on 68% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brentwood decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #234 of 296
85%
Householder approved
Below avg (90%) #248 of 296
35%
Decided in 8 weeks
Below avg (63%) #278 of 296
68%
Extended time limit
Above avg (41%) #283 of 296
76%
Minor dwellings approved
97 decided (1-9 homes)
64%
Major dwellings approved
11 decided (10+ homes)
79%
Change of use approved
19 decided
717
Total decisions
124 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.