Land to the south of Golden Cross Roundabout, Poyle 2, Slough, SL3 0AU Data via plota.co.uk

P/21155/001 - Certificate Proposed (Use/Development) Registered application

Proposal

Lawful development certificate for proposed installation of 7no. dual port EV charging upstands; and 1 no. substation, 1 no. LV Feeder Pillar, and 2no and charging cabinets on an existing car park. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
3 Nov 2026
✓
Consultation
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 24 Nov 2026; it is now day 8.

Site constraints 7

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Special protection area about 120 m away: South West London Waterbodies
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 120 m away: Wraysbury Reservoir SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
National infrastructure project about 1697 m away: M4 Junctions 3 to 12 Smart Motorway; Inside the Poyle built-up area; Air quality management area about 59 m away: Spelthorne AQMA.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 4 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Slough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Slough
Application type
Certificate Proposed (Use/Development)
Postcode
SL3 0AU
Received
2 Nov 2026
Validated
3 Nov 2026
Ward
Colnbrook-and-Poyle
Target decision
29 Dec 2026
Decision level
Delegated - Schedule 1
Applicant
Show
Agent
Enzygo

Decision outlook

Day 8, past Slough's usual 0 days for utility and infrastructure works. 89% are decided within thirteen weeks, so most likely by 2 Feb 2027.

Day 848 days to the 56-day target
81%decided within 8 weeks
100%approved
28decided in the last year

Plota live figures for utility and infrastructure works decided by Slough in the last twelve months, from validation. Slough decision record →

Consultation & key dates

Alt. reference
PP-15340859
Site or press notice
3 Nov 2026
Slough
Planning Authority Score
2.4/10
Poor
#260 of 296 councils
Relevant to this application:
Householder decisions

Slough is slower than most councils at deciding householder applications, ranking #263 out of 296. Slough is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Slough decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #275 of 296
82%
Householder approved
Below avg (90%) #269 of 296
42%
Decided in 8 weeks
Below avg (63%) #263 of 296
39%
Extended time limit
Below avg (41%) #142 of 296
60%
Minor dwellings approved
48 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
40%
Change of use approved
47 decided
617
Total decisions
137 refused in the year to March 2026