Land at Sterte Avenue West Poole BH15 2AA Data via plota.co.uk

P/26/03486/FUL - Full Planning Permission Application Under Consideration

Proposal

New external plant equipment and associated compounds and elevation alterations to include new louvres and escape door. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jul 2026
Decision
Expected by 17 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 78.

The consultation period closed on 29 Sept 2026.

Documents 20

Other documents 2

PDF Reports/Statements Cover Letter · 23 Jul 2026 View ↗
PDF Name hidden Show External Works Detail · 23 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 7

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Ramsar wetland 124 m away: Poole Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 124 m away: Poole Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Nature improvement area: Wild Purbeck; Inside the Poole built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH15 2AA
Received
23 Jul 2026
Validated
23 Jul 2026
Ward
Poole Town
Parish
Poole Town Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
DWD Ltd

Decision outlook

Day 78, past the statutory target. 77% of commercial and major works in BCP are decided within thirteen weeks, which runs to 22 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 3 Oct 2026.

Day 7822 days past the 56-day target
49%decided within 8 weeks
90%approved
42decided in the last year

Plota live figures for commercial and major works decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Consultation
5 Aug 2026
Comments by
29 Sept 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026