382 London Road Portsmouth PO2 9JY Data via plota.co.uk

26/00465/FUL - Full Application Awaiting decision

Proposal

Proposed development of 4 no. 4 bed dwellings and 2 no. 3 bed dwellings with associated parking, refuse and recycling provisions. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Apr 2026
Validated
3 Jun 2026
Consultation
18 Aug 2026
Decision
Expected by 30 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision soon after comments close on 8 Sept 2026; it is now day 103. The consultation period closed on 8 Sept 2026.

Documents 39

Plans & drawings 26

PDF 9147 07 REV B PROPOSED 3D PERSPECTIVES AND MATERIAL PALETTE Revised Drawing · 14 Aug 2026 View ↗ PDF 9147 04 REV B PROPOSED GROUND AND FIRST FLOOR PLANS (UNITS 3,4,5,6) Revised Drawing · 14 Aug 2026 View ↗ PDF 9147 02 REV B PROPOSED FLOOR PLANS AND FRONT ELEVATION (UNITS 1 AND 2) Revised Drawing · 14 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED FLOOR PLANS AND FRONT ELEVATION UNITS 1 & 2 Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED ELEVATIONS UNITS 1 & 2 Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED GROUND AND FIRST FLOOR PLANS (UNITS 3,4,5 & 6) Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED SECOND FLOOR AND FRONT ELEVATION UNITS 3,4,5 & 6) Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED REAR AND SIDE ELEVATIONS UNITS 3,4,5 & 6 Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED 3D PERSPECTIVES AND MATERIAL PALLETTE Revised Drawing · 11 Aug 2026 View ↗ PDF RECEIVED 7/08/26 PROPOSED SITE PLAN Revised Drawing · 10 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED SITE PLAN Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED FLOOR PLANS AND FRONT ELEVATIONS UNITS 1 AND 2 Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED ELEVATIONS UNITS 1 AND 2 Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED GROUND AND FIRST FLOOR PLANS (UNITS 3-6) Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED SECOND FLOOR AND FRONT ELEVATION (UNITS 3-6) Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED REAR AND SIDE ELEVATIONS (UNITS 3-6) Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED 3D PERSPECTIVES AND MATERIAL PALETTE Revised Drawing · 5 Aug 2026 View ↗ PDF SUPERSEDED PROPOSED 3D PERSPECTIVES AND MATERIAL PALETTE Revised Drawing · 5 Aug 2026 View ↗ PDF PLANNING DRAWINGS-9147 08 Drawing · 10 Jun 2026 View ↗ PDF SUPERSEDED SITE PLAN-9147 01 OS Extract · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 02 Additional Plans · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 03 Additional Plans · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 04 Additional Plans · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 05 Additional Plans · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 06 Additional Plans · 14 Apr 2026 View ↗ PDF SUPERSEDED PLANNING DRAWINGS-9147 07 Additional Plans · 14 Apr 2026 View ↗

All documents on the council site ↗

Site constraints 3

Grade II listed: Town Boundary Stone at Junction of London Road and Torrington Road
List entry 1333457 · 29 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO2 9JY
Received
13 Apr 2026
Validated
3 Jun 2026
Ward
Hilsea
Case officer
Show
Target decision
30 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Miura Architecture Limited

Decision outlook

Day 103, past the statutory target. 74% of new homes in Portsmouth are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 10347 days past the 56-day target
61%decided within 8 weeks
58%approved
37decided in the last year

Plota live figures for new homes decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

5comments received
5 objecting

100% object · above the UK average of 75%

56 neighbours consulted · Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14852454
Neighbours
14 Aug 2026
Consultation
18 Aug 2026
Comments by
8 Sept 2026
Site or press notice
17 Aug 2026
Statutory expiry
29 Jul 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026